About the data

All signals

Patterns in the public record that are worth a closer look. A signal is not a finding of wrongdoing. Most have ordinary explanations: re-tendering, variations, annual maintenance contracts, late bill settlement. Each one states how it was computed, and whether it rests on confirmed or inferred facts.

Signals are the raw first pass. The cases are what survived a document review; most signals did not.

Paid more than contract 3 projects
Bills after final bill 14 projects
Same document under two job numbers 24 projects
Long-running (3+ years) 9 projects
Much longer than time allowed 3 projects
Paid well over estimate 4 projects
Past expected completion, no final bill 1 project
Past stipulated completion 1 project
Placeholder photos 22 projects
Above plan, no variation visible 1 project
Quantity above plan 3 projects
Tender re-called 22 projects
Repeat single-bid winner 6 projects
Single bidder 11 projects
Running bill, no final bill 25 projects
Bidders with overlapping names 2 projects
Awarded far below estimate 2 projects
Fine levied 122 projects
Same bidders meet repeatedly 6 projects
Large deduction on a bill 9 projects
Paid years after work ended 91 projects
No bill after expected completion 11 projects
Partial release 45 projects
Many bills paid same day 8 projects
Placeholder reused across works 14 projects
qty_identical_to_plan 3 projects
Measurement book unreadable 5 projects
Near-identical work elsewhere 234 projects
Slow payment 214 projects
Paid at financial-year end 13 projects

Contractors (resolved entities)

Share of money in this dataset: paid (gross) where bills exist, otherwise the awarded contract value. Identity is confirmed only when every name variant was joined on an official identifier.

ContractorIdentityProjectsAmountShareBids / wins / sole-bid winsIdentifiers
M/s Simplex Infrastructures Limitedconfirmed 1₹160.67 Cr25.2% 0 / 0 / 0
M RAMESHinferred 12₹86.30 Cr13.5% 4 / 4 / 1IFMS:023007, KPPP:1552
RAMACHANDRA RAJU Kinferred 3₹37.30 Cr5.9% 1 / 0 / 0IFMS:024197
LOKESH Rconfirmed 3₹34.53 Cr5.4% 0 / 0 / 0IFMS:022698
M/s KRIDLinferred 92₹33.90 Cr5.3% 0 / 0 / 0
DASARADHA RAMI REDDYconfirmed 2₹27.87 Cr4.4% 0 / 0 / 0IFMS:012376
H D INFRASTRUCTURESconfirmed 1₹24.11 Cr3.8% 0 / 0 / 0
M/s Amrutha Construction Pvt Ltd Sri. P Venkateshwara Roaconfirmed 1₹21.15 Cr3.3% 0 / 0 / 0
Singe gowda rathna raviconfirmed 1₹18.96 Cr3.0% 0 / 0 / 0KPPP:932
AWIKA CONSTRUCTIONSinferred 8₹13.83 Cr2.2% 1 / 1 / 0KPPP:17612
VENKATAPPA( SRI VENKATESHWARA ENGINEERING WORK )inferred 5₹13.38 Cr2.1% 4 / 4 / 2KPPP:1864
V M R CONSTRUCTIONconfirmed 1₹10.06 Cr1.6% 0 / 0 / 0
B.Y. Perumaiahinferred 2₹8.57 Cr1.3% 0 / 0 / 0
SREEDHARA.K.Cinferred 28₹8.18 Cr1.3% 5 / 5 / 2IFMS:022360, KPPP:1384
Sri. Ramaiah Lokeshconfirmed 2₹7.48 Cr1.2% 0 / 0 / 0
K Venkata Rajuconfirmed 1₹7.28 Cr1.1% 1 / 1 / 0KPPP:3062
KRIDL BHUSIRI ACCOUconfirmed 12₹6.67 Cr1.0% 0 / 0 / 0
RAMAREDDY PEDDAPPA REDDY MAHESHKUMAR (1)( BALAJI CONSTRUCTIONS )confirmed 1₹5.96 Cr0.9% 1 / 1 / 0KPPP:27432
SRINIVASA REDDY Hconfirmed 1₹5.62 Cr0.9% 0 / 0 / 0IFMS:022283
VENKATAPPA VENKATESHAIAH (1)( MATHRU SHREE ENGINEERING WORKS )confirmed 2₹5.39 Cr0.8% 4 / 2 / 2KPPP:7651
SHIVAKUMAR R( SHREE SAI ENTERPRISES )inferred 3₹4.42 Cr0.7% 3 / 2 / 0KPPP:35531
Technical Manager (South)inferred 4₹4.25 Cr0.7% 0 / 0 / 0
Y H KRISHNAinferred 9₹4.22 Cr0.7% 0 / 0 / 0IFMS:022294
VIJAYALAKSHMI ASSOCIinferred 5₹4.10 Cr0.6% 0 / 0 / 0IFMS:022484
ALFATH TRADING ANDconfirmed 1₹4.08 Cr0.6% 0 / 0 / 0IFMS:035215
R M RAVI (CONTRACTOinferred 14₹3.99 Cr0.6% 4 / 2 / 0KPPP:1512
TECHNICAL MANAGER-3inferred 4₹3.18 Cr0.5% 0 / 0 / 0
Sri. K R Pratheekinferred 14₹3.16 Cr0.5% 0 / 0 / 0
M/s R K Brothers Infraprop Proventures Private Limitedconfirmed 1₹3.11 Cr0.5% 0 / 0 / 0
NANDISH GOWDA G Rinferred 3₹3.04 Cr0.5% 3 / 1 / 0KPPP:17859

Bidders who keep meeting (3+ Koramangala tenders together)