Bengaluru Public Works Explorer Koramangala

← All works

Water supply & sewerage · job 151-18-000089

Providing and Extension of Pipelines for drinking Water purpose from Existing Borewells in ward 151 Koramangala

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Executive Engineer B T M Layout South Zone
—contract / award · unknown
₹8.48 Lpaid, gross
1bills
16 Jun 2021last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
Tender EE(BTM)/JE/e-proc/04/2018-19 tender ↔ bills linked by matching (high confidence)

Signals — patterns worth a closer look, not findings of wrongdoing

  • info Median 837 days from bill registration to payment confirmed
    Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
  • info Bill paid 2 years after work end date confirmed
    Long payment lag; common with BBMP bill backlogs (seniority-based payment). [source]
  • info Contractor holds 0% of Koramangala money (10 projects) inferred
    C0012 SATHISH NAYAK K (identity inferred; ids: none): ₹27,751,149 across 10 projects in this dataset. Concentration is common for ward maintenance contracts; it is context, not a finding.
    Related: 151-18-000068, 151-18-000067, 147-18-000067, 151-17-000003, 147-17-000088, 151-17-000039 …
  • info Near-identical work under another number (151-19-000076) inferred
    Descriptions are 100% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 151-19-000076

1 · What was planned

Work
Providing and Extension of Pipelines for drinking Water purpose from Existing Borewells in ward 151 Koramangala confirmed [1]
Where
Unknown unknown
No place name could be read from the description
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
22 Sep 2018 inferred [1]
Date the first call of the tender was published
↳ from a tender matched to these bills (high confidence) — why
Tender calls
1 (first call) inferred [1]
Tender awarded/listed on its first call
↳ from a tender matched to these bills (high confidence) — why
Time allowed
90 days (~3 months) inferred [1]
Period of completion in the tender notification (“90 Days”) (read by OCR from a scanned government document — digits may be misread)
↳ from a tender matched to these bills (high confidence) — why

2 · Who got the work (contract)

Contractor
Sri. Satish Nayka confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0012 · SATHISH NAYAK K inferred [1]
Resolved contractor C0012 “SATHISH NAYAK K”; identifiers: no official identifier in the data; name variants joined by: same registered mobile on BBMP bills (not published) + similar name ×28, same / truncated name ×2. Also appears as: K Satish Nayak, Sathis Nayak, Sathish Nayak, Satish Nayak, Sri Satish Nayak….
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
19 Nov 2018 confirmed [1]
Work order date on the bill (order no. 000304)
Commencement (work order)
21 Nov 2018 inferred [1]
Date of commencement in the Completion Certificate (read by OCR from the scanned document)

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; Quality Certificate ×1 confirmed [1] [2]
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹8.48 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹8.07 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
16 Jun 2021 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
16 Jun 2021 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
837 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
11 remark(s); e.g. 2021-06-15: “Forwarded — Verified with bill form as per CAO Inter Office Memo No CAO/PR/5272/15-16 dated 26-12-2015. Based on the recommendation of concerned divisional EE a” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
21 Nov 2018 confirmed [1]
Work start date on the bill
Expected completion
17 Feb 2019 inferred [1] [2]
2018-11-19 (work order date) + 90 days stipulated period. The contractual start is the notice-to-proceed date, which is not published, so this is approximate
↳ from a tender matched to these bills (high confidence) — why
Final bill
Raised 02 Mar 2019 confirmed [1]
A bill of type “First and Final” exists
Completed on
12 Dec 2018 confirmed [1]
Work end date recorded on the final bill

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 22 Sep 2018 Tender EE(BTM)/JE/e-proc/04/2018-19 published inferred source
  2. 19 Nov 2018 Work order issued source
  3. 12 Dec 2018 Work end date on final bill
  4. 17 Feb 2019 Expected completion (award/work order + time allowed) inferred
  5. 16 Jun 2021 First and Final bill ₹8.48 L paid source

Tender notices

Tender no.SourcePublishedStatusEstimateAwardedToTime allowedLinkEvidence
EE(BTM)/JE/e-proc/04/2018-19BBMP list22 Sep 2018Tender notified (outcome not in this document) ——— 90 dayshigh record

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000240 · 02 Mar 2019 000304 19 Nov 2018 ₹8,47,823₹8,06,882 16 Jun 2021 Sri. Satish Nayka BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 86

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)