Roads, drains & footpaths (combined) · job 304-14-000048

Improvements to Drain and footpath and Asphalting to Koramangala 80 feet Road (from Sony world to Ejipura Drain)

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Executive Engineer Major Road South Central Zone
—contract / award · unknown
₹35.80 Lpaid, gross
2bills
14 Aug 2018last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Activity spread over 4.7 years confirmed
    First record 2013-12-19, last 2018-08-14. Long gaps can mean phased work, delays or late bill settlement. [source] [source]
  • info Median 972 days from bill registration to payment confirmed
    Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
  • info Contractor holds 5% of Koramangala money (92 projects) inferred
    C0001 M/s KRIDL (identity inferred; ids: none): ₹339,017,742 across 92 projects in this dataset. Concentration is common for ward maintenance contracts; it is context, not a finding.
    Related: 151-19-000007, 151-18-000030, 151-19-000021, 151-19-000027, 151-19-000023, 151-18-000031 …
  • info Near-identical work under another number (304-14-000047) inferred
    Descriptions are 84% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 304-14-000047

1 · What was planned

Work
Improvements to Drain and footpath and Asphalting to Koramangala 80 feet Road (from Sony world to Ejipura Drain) confirmed [1]
Where
80 Feet Road; Ejipura inferred
Place names read from the work description text
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
M/s KRIDL confirmed [1] [2]
Payee with the largest billed amount under this job number
Contractor identity
C0001 · M/s KRIDL inferred [1] [2]
Resolved contractor C0001 “M/s KRIDL”; identifiers: no official identifier in the data; name variants joined by: same registered mobile on BBMP bills (not published) + similar name ×3, same / truncated name ×3. Also appears as: KRIDL, M/s.KRIDL, kridl.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
19 Dec 2013 confirmed [1]
Work order date on the bill (order no. 000017)

3 · Work documented

Bills recorded
1 running, 1 final paid/registered confirmed [1] [2]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; Inspection Report ×2; M.B ×3; Quality Certificate ×2; Road History ×2 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹35.80 L confirmed [1] [2]
Sum of 2 bill(s) under the job number
Paid (nett)
₹31.18 L confirmed [1] [2]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
2 confirmed [1] [2]
Unique bills after merging duplicates across exports
First payment
14 Aug 2018 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
14 Aug 2018 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
972 confirmed [1]
Median days from bill registration to RTGS payment over 2 IFMS bill(s)
Approval remarks
36 remark(s); e.g. 2018-08-08: “Approved by CAO — Approved for payment as per the verification report” confirmed [1]
Remarks written by officials in the IFMS approval chain
14 Aug 2018cumulative payments14 Aug 2018

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 16 Dec 2015 confirmed [1]
A bill of type “Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date

6 · Physical evidence

Site photos
6 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 19 Dec 2013 Work order issued source
  2. 14 Aug 2018 Running bill ₹17.90 L paid source
  3. 14 Aug 2018 Final bill ₹17.90 L paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000036 · 02 Nov 2015 000017 19 Dec 2013 ₹17,90,000₹15,59,000 RTGS 169 14 Aug 2018 M/s KRIDL BBMP Bill Register 01-04-2018 to 30-09-2018 · row 4709
Final 000065 · 16 Dec 2015 — ₹17,89,624₹15,58,720 RTGS 000169 14 Aug 2018 M/s KRIDL BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…to Drain and footpath and Asphalting to Koramangala 80 feet Road (from Sony world…"