Bengaluru Public Works Explorer Koramangala

← All works

Street lighting & electrical · job 151-18-000093

Upgradation of Lightings at parks and arranging music System at Lakshmi Devi Park in 6th block Koramangala in ward No.151 Koramangala..

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Executive Engineer Electrical South Zone
—contract / award · unknown
₹14.56 Lpaid, gross
1bills
25 Apr 2022last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • info Fine / penalty deducted from a bill confirmed
    IFMS deductions: fine ₹72,797. Penalties usually relate to delay or quality; their reason is not in the public record. [source]
  • info Median 885 days from bill registration to payment confirmed
    Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
  • info Bill paid 2 years after work end date confirmed
    Long payment lag; common with BBMP bill backlogs (seniority-based payment). [source]
  • info Near-identical work under another number (151-18-000086) inferred
    Descriptions are 88% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 151-18-000086
  • info Near-identical work under another number (151-18-000058) inferred
    Descriptions are 89% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 151-18-000058

1 · What was planned

Work
Upgradation of Lightings at parks and arranging music System at Lakshmi Devi Park in 6th block Koramangala in ward No.151 Koramangala.. confirmed [1]
Where
6th Block Koramangala inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
JAICAB ELECTRICALS confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0176 · JAICAB ELECTRICALS confirmed [1]
Resolved contractor C0176 “JAICAB ELECTRICALS”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
26 Feb 2019 confirmed [1]
Work order date on the bill (order no. 000179)

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; Inspection Report ×1; M.B ×1; Quality Certificate ×1; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹14.56 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹13.12 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
25 Apr 2022 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
25 Apr 2022 confirmed [1]
Latest payment (CBR/RTGS) date
Fines / withheld / recoveries
fine ₹72,797 confirmed [1]
Deduction heads recorded in IFMS across this job's bills
Bill → payment (median days)
885 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
8 remark(s); e.g. 2022-04-22: “Forwarded — Verified with bill form as per CAO Inter Office Memo No CAO/PR/5272/15-16 dated 26-12-2015. Based on the recommendation of concerned divisional EE a” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
15 Feb 2019 confirmed [1]
Work start date on the bill
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 22 Nov 2019 confirmed [1]
A bill of type “First and Final” exists
Completed on
16 Sep 2019 confirmed [1]
Work end date recorded on the final bill
Extensions of time
1 extension-of-time document(s) attached; no extended date could be read inferred [1]
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 26 Feb 2019 Work order issued source
  2. 16 Sep 2019 Work end date on final bill
  3. 25 Apr 2022 First and Final bill ₹14.56 L paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000220 · 22 Nov 2019 000179 26 Feb 2019 ₹14,55,942₹13,12,013 25 Apr 2022 JAICAB ELECTRICALS BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 67

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)