Bengaluru Public Works Explorer Koramangala

← All works

Roads, drains & footpaths (combined) · job 151-17-000100

Improvements to road, drains and footpath in 17th F-1 to 17th F-4 and 17th G main road near Subramanya Park, 6th block Koramangala and surrounding areas in Ward No.151 Koramangala

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Executive Engineer B T M Layout South Zone
—contract / award · unknown
₹48.63 Lpaid, gross
1bills
15 Jul 2021last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
Tender BBMP/2017-18/OW/WORK_INDENT28632 tender ↔ bills linked by matching (high confidence)

Signals — patterns worth a closer look, not findings of wrongdoing

  • info Median 837 days from bill registration to payment confirmed
    Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
  • info Bill paid 2 years after work end date confirmed
    Long payment lag; common with BBMP bill backlogs (seniority-based payment). [source]

1 · What was planned

Work
Improvements to road, drains and footpath in 17th F-1 to 17th F-4 and 17th G main road near Subramanya Park, 6th block Koramangala and surrounding areas in Ward No.151 Koramangala confirmed [1]
Where
17th G Main Road; 6th Block Koramangala inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
₹49.92 L inferred [1]
Estimated Contract Value (ECV) in the tender
↳ from a tender matched to these bills (high confidence) — why
Tender published
08 Feb 2018 inferred [1]
Date the first call of the tender was published
↳ from a tender matched to these bills (high confidence) — why
Tender calls
1 (first call) inferred [1]
Tender awarded/listed on its first call
↳ from a tender matched to these bills (high confidence) — why
Time allowed
Unknown unknown
Tender document not available or period not stated

2 · Who got the work (contract)

Contractor
Sri. B S Mahesh Kumar confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0096 · Sri. B S Mahesh Kumar inferred [1]
Resolved contractor C0096 “Sri. B S Mahesh Kumar”; identifiers: no official identifier in the data; name variants joined by: same registered mobile on BBMP bills (not published) + similar name ×1. Also appears as: Sri. Mahesh kumar B S.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
18 Jan 2019 confirmed [1]
Work order date on the bill (order no. 000413)

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; M.B ×5; Quality Certificate ×1; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹48.63 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹46.59 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
15 Jul 2021 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
15 Jul 2021 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
837 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
18 remark(s); e.g. 2021-07-15: “Approved by CAO — Approved as per the verification report of CE TVCC and the recommendation of cao As” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
21 Jan 2019 confirmed [1]
Work start date on the bill
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 31 Mar 2019 confirmed [1]
A bill of type “First and Final” exists
Completed on
05 Mar 2019 confirmed [1]
Work end date recorded on the final bill
Completion certificate date
05 Mar 2019 inferred [1]
Completion date stated in the Completion Certificate (read by OCR from the scanned document)

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)
Satellite imagery
Location could not be pinned down inferred [1] [2]
Manual comparison of satellite captures 2017-12-10 (WV03_VNIR, 0.31 m) → 2020-02-28 (WV03_VNIR, 0.31 m) around the geocoded point: Subramanya Park / 17th F–G Main are not resolvable in OSM; the fallback is the 6th Block centroid. Experimental: location is geocoded from place names in the description, captures are not perfectly co-registered, and small works (drains, footpaths) are below what 0.3–0.6 m imagery can show.

Timeline

  1. 08 Feb 2018 Tender BBMP/2017-18/OW/WORK_INDENT28632 published — estimate ₹49.92 L inferred source
  2. 18 Jan 2019 Work order issued source
  3. 05 Mar 2019 Work end date on final bill
  4. 15 Jul 2021 First and Final bill ₹48.63 L paid source

Tender notices

Tender no.SourcePublishedStatusEstimateAwardedToTime allowedLinkEvidence
BBMP/2017-18/OW/WORK_INDENT28632BBMP list08 Feb 2018Tender published (outcome not in this list) ₹49.92 L—— —high record · row 5037

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000260 · 31 Mar 2019 000413 18 Jan 2019 ₹48,62,721₹46,58,771 15 Jul 2021 Sri. B S Mahesh Kumar BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 73

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)