Drains & storm-water · job 151-16-000011
Providing flagging course and covering slab to drain at 12th Main,4th cross and surrounding area 4th block, in ward No.151 (Koramangala)
—contract / award · unknown
₹9.50 Lpaid, gross
1bills
02 Mar 2018last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
no tender found for these bills
Signals — patterns worth a closer look, not findings of wrongdoing
-
info Median 620 days from bill registration to payment confirmed
Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
-
info Near-identical work under another number (151-16-000008) inferred
Descriptions are 98% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 151-16-000008 -
info Near-identical work under another number (151-16-000007) inferred
Descriptions are 95% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 151-16-000007
1 · What was planned
Work
Providing flagging course and covering slab to drain at 12th Main,4th cross and surrounding area 4th block, in ward No.151 (Koramangala)
confirmed [1]
Where
12th Main; 4th Cross; 4th Block
inferred
Place names read from the work description text
Ward
Estimated cost
Unknown
unknown
No estimate published for this work in the sources used
Tender published
Unknown
unknown
No tender found or matched for this work
Time allowed
Unknown
unknown
No tender document found or matched
2 · Who got the work (contract)
Contractor
Contractor identity
C0190 · Sri N Dayanada
confirmed [1]
Resolved contractor C0190 “Sri N Dayanada”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown
unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
3 · Work documented
Bills recorded
0 running, 1 final paid/registered
confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
4 · Money paid
Paid (gross)
Paid (nett)
Bills
First payment
Last payment
Bill → payment (median days)
Approval remarks
12 remark(s); e.g. 2018-03-09: “Approved by CAO — Approved for payment as per the verification report”
confirmed [1]
Remarks written by officials in the IFMS approval chain
5 · Completion
Status
Completed (final bill)
inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Expected completion
Unknown
unknown
Stipulated period of completion not found in any public record
Final bill
Completed on
6 · Physical evidence
Timeline
How the tender and the bills were connected
Tenders and BBMP bills share no common number, so connections are inferred from independent evidence. Accepted links feed the facts above (marked inferred); possible ones are listed only for review and change nothing.
Possible — not merged ·
BBMP/2011-12/OW/WORK_INDENT2512 (BBMP tender list 2013–18) ·
confidence possible · description similarity 51%
“Improvements to secondary drain (nadu beedi) at 8th block, Koramangala village in ward no. 151” source
✓ same kind of work (drain) · ward numbers agree · same engineering division
✗ different places named (block8, koramangala village vs block4, cross4, main12) · bills begin 33 months after the tender (re-tender or a different contract?)
Possible — not merged ·
BBMP/2014-15/OW/WORK_INDENT17032 (BBMP tender list 2013–18) ·
confidence possible · description similarity 52%
“Improvements to park and construction of reading room at 8th main 4th block in Koramangala in ward no 151” source
✓ same place(s): block4 · ward numbers agree · bills start 411 days after tender
✗ different kind of work (building, park vs drain)
Bills & payments (BBMP)
| Bill type | Bill reg. (BR) | Work order | Gross | Nett | Payment | Payee | Source |
|---|---|---|---|---|---|---|---|
| First and Final | 000094 · 30 Jun 2016 | 000007 30 Jun 2016 | ₹9,49,813 | ₹8,27,385 | 010127 02 Mar 2018 | Sri N Dayanada | BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 155 |
Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.
Why this is a Koramangala project
Booked to Koramangala ward (151 under the 198-ward map)