Bengaluru Public Works Explorer Koramangala

← All works

Drains & storm-water · job 151-17-000001

Size Stone Masonary in SWD secondary drain Koramangala 6th block in ward no 151

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Chief Engineer SWD Central Zone
—contract / award · unknown
₹23.24 Lpaid, gross
1bills
22 Feb 2021last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • info Fine / penalty deducted from a bill confirmed
    IFMS deductions: fine ₹10,000. Penalties usually relate to delay or quality; their reason is not in the public record. [source]
  • info Median 872 days from bill registration to payment confirmed
    Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
  • info Bill paid 2 years after work end date confirmed
    Long payment lag; common with BBMP bill backlogs (seniority-based payment). [source]

1 · What was planned

Work
Size Stone Masonary in SWD secondary drain Koramangala 6th block in ward no 151 confirmed [1]
Where
Koramangala 6th Block inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
On sanctioned works list
FY 2016-17 confirmed [1]
Listed with this job code on the BBMP ward works list (BBMP ward works list FY 2016-17 — Koramangala); budget head P0190 Works sanctioned by Hon Mayor
Estimated cost
₹24.00 L confirmed [1]
Estimate on the BBMP ward works list FY 2016-17 for this job code (Chief Engineer SWD Central Zone)
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
TECHNICAL MANAGER-3 confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0051 · TECHNICAL MANAGER-3 inferred [1]
Resolved contractor C0051 “TECHNICAL MANAGER-3”; identifiers: no official identifier in the data; name variants joined by: same / truncated name ×1. Also appears as: The Technical Manager-3.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
24 Aug 2016 confirmed [1]
Work order date on the bill (order no. 100008)

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×1; Inspection Report ×1; M.B ×3; Quality Certificate ×1; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹23.24 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹20.59 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
22 Feb 2021 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
22 Feb 2021 confirmed [1]
Latest payment (CBR/RTGS) date
Fines / withheld / recoveries
fine ₹10,000 confirmed [1]
Deduction heads recorded in IFMS across this job's bills
Bill → payment (median days)
872 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
16 remark(s); e.g. 2021-02-22: “Forwarded — Verified with bill form as per CAO Inter Office Memo No CAO/PR/5272/15-16 dated 26-12-2015. Based on the recommendation of concerned divisional EE a” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
24 Aug 2016 confirmed [1]
Work start date on the bill
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 06 Oct 2018 confirmed [1]
A bill of type “First and Final” exists
Completed on
19 Jul 2018 confirmed [1]
Work end date recorded on the final bill
Extensions of time
4 extension-of-time order(s): to 2017-09-30; to 2017-09-30; to 2018-07-31; to 2018-07-31 inferred [1] [2] +2
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why
Extended completion
31 Jul 2018 inferred [1]
Latest completion date granted by an extension-of-time order found in IFMS.
↳ from a tender matched to these bills (none confidence) — why

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 24 Aug 2016 Work order issued source
  2. 19 Jul 2018 Work end date on final bill
  3. 22 Feb 2021 First and Final bill ₹23.24 L paid source

Planning records (archived BBMP documents)

DocumentEntryAmountStatusLinkSource
BBMP ward works list FY 2016-17 — Koramangala Size Stone Masonary in SWD secondary drain Koramangala 6th block in ward no 151₹24.00 L— exactarchived copy · row 1

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000176 · 06 Oct 2018 100008 24 Aug 2016 ₹23,23,944₹20,58,844 004393 22 Feb 2021 TECHNICAL MANAGER-3 BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 150

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)