| 151-16-000019 — Comprehensive Development of roads by providing asphalting drains and foorpaths |
quantity above plan (low confidence): billed 3,605.57 vs plan 2,310.32 rests on a sum of running-bill abstracts, not on a cumulative or final figure; not reliable enough to present. document reuse (explained): the shared work order / agreement is one package contract worth ₹7.50 Cr; payments on this job and 151-16-000025 total ₹7.48 Cr (100% of it), consistent with one contract booked under several job codes. |
| 151-17-000007 — Improvements to balance park in Koramangala in ward noi 151 |
final bill without mb (explained): An MB-like file is attached under another type: -42816468-MB 151-17-000007.pdf, BA-L4L4-ifms422-31633894-4-MB 151-17-000007.pdf. |
| 151-17-000006 — Improvements to Subramanyaswamy temple park Koramangala 6th block in ward no 151 |
final bill without mb (explained): An MB-like file is attached under another type: -81232886-MB 151-17-000006.pdf, BA-L4L4-ifms422-24386333-4-MB 151-17-000006.pdf. |
| 151-18-000012 — Construction of RCC Box Culvert and drains at 80 feet Ring Road opposite to BMTC |
quantity above plan (low confidence): billed 121 vs plan 64 rests on a sum of running-bill abstracts, not on a cumulative or final figure; not reliable enough to present. |
| 186-23-000001 — Comprehensive Balance Development & Improvements to Multipurpose Building & Cons |
quantity above plan (low confidence): the same approved statement covers 2 sibling item(s) (2 → 5 executed; 2 → 5 executed); this item's row is illegible, so it is set aside rather than presented. quantity above plan (explained): A work slip / comparative statement records an executed quantity of 5 for the item (billed 4), so the increase is covered by a variation document. quantity above plan (explained): A work slip / comparative statement records an executed quantity of 5 for the item (billed 4), so the increase is covered by a variation document. |
| 304-15-000370 — Improvements and Development of Mesthri Palya Park in Koramangala. |
paid over contract (explained): the job carries 3 work orders (₹3.51 Cr, ₹4.2 L, ₹3.00 Cr, total ₹6.55 Cr); payments of ₹6.61 Cr are 101% of that total. The earlier signal compared payments with only one work order. document reuse (artefact): the only file shared with other jobs is a 'Not Applicable' placeholder PDF. |
| 151-20-000096 — Comprehensive development and Improvements to roads in 7th Block. Shanthinagara |
quantities identical to plan (low confidence): only 0 of the 3 identical items are confirmed by a final bill or comparative statement; the rest are running-bill snapshots, which Phase 6 showed can change by the final bill. |
| 174-24-000004 — Comprehensive Development and Construction of RCC Box Drains, Culvert, Cobble st |
final bill without mb (artefact): IFMS exposes no bill-level attachments (of any type) for this job's bills to public requests, so a missing MB cannot be inferred. |
| 151-21-000002 — Construction and Improvements of Multipurpose buildings, Development of Play gro |
quantity above plan (explained): A work slip / comparative statement records an executed quantity of 390.56 for the item (billed 385.11), so the increase is covered by a variation document. |
| 151-23-000003 — Comprehensive Development and Asphalting to roads and Construction of RCC Drains |
quantities identical to plan (artefact): the 'identical' quantities came from a running bill's up-to-date column; the comparative statement records different final executed quantities (1,205.16 tendered → 1,771.56 executed; 135.36 tendered → 433.21 executed), leaving fewer than three identical items. |
| 151-16-000025 — Asphalting to 1st block Koramangala in ward no151 Koramangala |
document reuse (explained): the shared work order / agreement is one package contract worth ₹7.50 Cr; payments on this job and 151-16-000019 total ₹7.48 Cr (100% of it), consistent with one contract booked under several job codes. |
| 307-19-000009 — Construction of parallel Drain to SWD K-100 by laying RCC hume Pipes all along t |
quantity above plan (low confidence): billed 150 vs plan 100 rests on a sum of running-bill abstracts, not on a cumulative or final figure; not reliable enough to present. quantity above plan (low confidence): billed 967.85 vs plan 738.05 rests on a sum of running-bill abstracts, not on a cumulative or final figure; not reliable enough to present. |
| 174-24-000005 — Over all development and improvements of road side drains, Culvert, Footpath and |
final bill without mb (artefact): IFMS exposes no bill-level attachments (of any type) for this job's bills to public requests, so a missing MB cannot be inferred. |
| 174-25-000007 — Repairs to BBMP Koramangala Nursery School in new ward no 174 (Old ward no 151) |
final bill without mb (artefact): IFMS exposes no bill-level attachments (of any type) for this job's bills to public requests, so a missing MB cannot be inferred. |
| 152-20-000049 — Providing Asphalting improvements to roads, drains and footpath and other develo |
document reuse (artefact): the only file shared with other jobs is a 'Not Applicable' placeholder PDF. |
| 304-20-000212 — Comprehensive Development of Arterial, Sub arterial roads in and around Koramang |
document reuse (artefact): the only file shared with other jobs is a 'Not Applicable' placeholder PDF. |
| 148-23-000003 — Comprehensive Development and Improvements to footpath, Construction of RCC Drai |
no case-type issue survives on this project |
| 151-14-000060 — Providing Cement concrete designer tiles to footpath Northern side and Improveme |
no case-type issue survives on this project |