Roads, drains & footpaths (combined) · job 147-13-000053
Improvements to road side drains and Footpath of 1st E cross road and Surrounding area roads in 8th block Koramangala in ward no. 147
—contract / award · unknown
₹8.25 Lpaid, gross
1bills
08 Jun 2016last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
no tender found for these bills
Signals — patterns worth a closer look, not findings of wrongdoing
-
info Fine / penalty deducted from a bill confirmed
IFMS deductions: fine ₹6,000; mobilizationadvance ₹8,255. Penalties usually relate to delay or quality; their reason is not in the public record. [source]
-
info Median 714 days from bill registration to payment confirmed
Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
-
info Near-identical work under another number (147-13-000052) inferred
Descriptions are 100% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 147-13-000052 -
info Near-identical work under another number (147-13-000062) inferred
Descriptions are 99% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 147-13-000062
1 · What was planned
Work
Improvements to road side drains and Footpath of 1st E cross road and Surrounding area roads in 8th block Koramangala in ward no. 147
confirmed [1]
Where
1st E Cross Road; 8th Block Koramangala
inferred
Place names read from the work description text
Ward
Estimated cost
Unknown
unknown
No estimate published for this work in the sources used
Tender published
Unknown
unknown
No tender found or matched for this work
Time allowed
Unknown
unknown
No tender document found or matched
2 · Who got the work (contract)
Contractor
Contractor identity
C0205 · B S Vishwanath
confirmed [1]
Resolved contractor C0205 “B S Vishwanath”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown
unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
3 · Work documented
Bills recorded
0 running, 1 final paid/registered
confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
4 · Money paid
Paid (gross)
Paid (nett)
Bills
First payment
Last payment
Fines / withheld / recoveries
fine ₹6,000; mobilizationadvance ₹8,255
confirmed [1]
Deduction heads recorded in IFMS across this job's bills
Bill → payment (median days)
Approval remarks
15 remark(s); e.g. 2016-06-10: “Approved by CAO — Bill approved for the payment as per the scrutiny and verification report forwarded by CE(TVCC)”
confirmed [1]
Remarks written by officials in the IFMS approval chain
5 · Completion
Status
Completed (final bill)
inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Expected completion
Unknown
unknown
Stipulated period of completion not found in any public record
Final bill
Completed on
Extensions of time
5 extension-of-time document(s) attached; no extended date could be read
inferred [1] [2] +3
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why
6 · Physical evidence
Timeline
How the tender and the bills were connected
Tenders and BBMP bills share no common number, so connections are inferred from independent evidence. Accepted links feed the facts above (marked inferred); possible ones are listed only for review and change nothing.
Possible — not merged ·
BBMP/2011-12/OW/WORK_INDENT2512 (BBMP tender list 2013–18) ·
confidence possible · description similarity 54%
“Improvements to secondary drain (nadu beedi) at 8th block, Koramangala village in ward no. 151” source
✓ same kind of work (drain) · same place(s): block8 · bills start 191 days after tender · same engineering division
✗ ward numbers differ (tender 151, 174, 186)
Possible — not merged ·
BBMP/2017-18/OW/WORK_INDENT27425 (BBMP tender list 2013–18) ·
confidence possible · description similarity 51%
“Improvements to drains in New Model Harijana Colony, Koramangala 8th Block in ward No. 147 (Adugodi)” source
✓ same kind of work (drain) · same place(s): block8 · ward numbers agree · same engineering division
✗ bills start 1358 days before the tender · job-number year far from tender year
Possible — not merged ·
BBMP/2025-26/OW/WORK_INDENT7580 (KPPP) ·
confidence possible · description similarity 70%
“Improvements to roads, drains and Footpath in 7th Blcok and 8th Block Koramangala in ward No.176 Adugodi” source
✓ same kind of work (drain, footpath, road) · same place(s): block8 · ward numbers agree · same engineering division
✗ awarded bidder not among payees · bills start 4132 days before the tender · job-number year far from tender year
Bills & payments (BBMP)
| Bill type | Bill reg. (BR) | Work order | Gross | Nett | Payment | Payee | Source |
|---|---|---|---|---|---|---|---|
| First and Final | 000200 · 30 Jun 2014 | 000289 30 Jun 2014 | ₹8,25,110 | ₹7,19,310 | 002181 08 Jun 2016 | B S Vishwanath | BBMP Work Orders - Adugodi (Ward 147), 2013-2022 · row 205 |
Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.
Why this is a Koramangala project
Work description names Koramangala: "…and Surrounding area roads in 8th block Koramangala in ward no. 147…"