Bengaluru Public Works Explorer Koramangala

← All works

Roads, drains & footpaths (combined) · job 148-16-000031

Construction of RCC Box drain from passport office to KPWD quarters and culverts across 80 feet ring road in Kormangala ward no.148 Ejipura

Running bill only (no final bill found) Bruhat Bengaluru Mahanagara Palike
₹1.32 Crcontract / award · inferred
₹1.12 Crpaid, gross
1bills
27 Apr 2017last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Running bill but no final bill in 3+ years inferred
    Last bill/payment 2017-04-27. The work may be finished with the final bill outside these exports, or stalled. [source] [source]

1 · What was planned

Work
Construction of RCC Box drain from passport office to KPWD quarters and culverts across 80 feet ring road in Kormangala ward no.148 Ejipura confirmed [1]
Where
80 Feet Ring Road; Ejipura inferred
Place names read from the work description text
Ward
148 (198-ward map) confirmed [1]
Ward the bills are booked to
On sanctioned works list
FY 2015-16 confirmed [1]
Listed with this job code on the BBMP ward works list (BBMP ward works list FY 2015-16 — Ejipura); budget head P3110 14th Finance Commission Grant Works
Estimated cost
₹1.50 Cr confirmed [1]
Estimate on the BBMP ward works list FY 2015-16 for this job code (Chief Engineer SWD Central Zone)
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
G M Ravindra confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0118 · G M Ravindra confirmed [1]
Resolved contractor C0118 “G M Ravindra”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
₹1.32 Cr inferred [1]
Contract / tender price stated in the Work Order (read by OCR from the scanned document)

3 · Work documented

Bills recorded
1 running, 0 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Inspection Report ×1; M.B ×2; Quality Certificate ×5; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
5 of 11 planned items compared (Schedule B (contract BOQ) vs bill abstracts); median quantity difference -13% inferred [1] [2] +4
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹1.12 Cr confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹1.04 Cr confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Paid vs contract
85% inferred [1] [2]
Gross paid ÷ contract value (contract value is inferred; it may cover only part of the job, e.g. one of several work orders)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
27 Apr 2017 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
27 Apr 2017 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
10 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
9 remark(s); e.g. 2017-04-27: “Approved by CAO — Approved for payment as per the verification report” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Running bill only (no final bill found) inferred [1]
Latest bill is a part (running) bill; no final bill in the published data
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Completed on
Unknown unknown
No final bill found

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
fications as per MORTH specifications No & . TMT bars Fe MT Rupees Sixty One Thousand Onlynos 62.03 ₹61,000 — — not billed / not read high [1]
anite metal coarse aggregates @ .7cum and fine aggregates @ Cum Rupees Seven Thousand Onlycum 296.51 ₹7,000 267.75 -10% bill abstracts (sum of read bills) medium [1] [2]
@ 360kgs, with 20mm and down size graded granite metal coarse aggregates Cum P Hisdred Ontcum 267.84 ₹6,800 — — not billed / not read high [1]
to 1S9103- Reaffirmed- complete as per Drawing and Technical Cum) Rupees Six Thousand Onlycum 296.04 ₹6,000 267.75 -10% bill abstracts (sum of read bills) medium [1] [2]
ing cms. thick, well compacted, in foundation, plinth and cills, ncluding Cum ounces a Biscum 119.08 ₹4,900 — — not billed / not read high [1]
ing, including cost of all materials and labours with all lead and lift. Cum manor ao Ninecum 206.04 ₹1,900 178.50 -13% bill abstracts (sum of read bills) high [1] [2]
earth work etc., complete and as per the direction of the Engineer Cum) Rupees Eighty Onlycum 1,099.64 ₹80 862.75 -22% bill abstracts (sum of read bills) high [1] [2]
of stumps and other deleterious matter, dresseing of sides and Cum Rupees Thirty Five Onlycum 1,099.64 ₹35 — — not billed / not read high [1]
er during excavation and until completion cte... complete up to Cum Rupees Two aia apd Fencum 119.88 ₹210 96.39 -20% bill abstracts (sum of read bills) medium [1] [2]
s with 110mm outer dia kg/Sqm pressure pipe of approved make( PVC) rn Rupees Fourteen Onlysqm 124.80 ₹140 — — not billed / not read high [1]
e and consolidating as per water bound macadam specifications Sqm : Rupees Fifty Five Onlysqm 156.20 ₹55 — — not billed / not read high [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 27 Apr 2017 Running bill ₹1.12 Cr paid source

Planning records (archived BBMP documents)

DocumentEntryAmountStatusLinkSource
BBMP ward works list FY 2015-16 — Ejipura Construction of RCC Box drain from passport office to KPWD quarters and culverts across 80 feet ring road in Kormangala ward no.148 Ejipura₹1.50 Cr— exactarchived copy · row 31

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000003 · 17 Apr 2017 — ₹1,11,67,600₹1,04,00,250 RTGS 000036 27 Apr 2017 G M Ravindra BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…nd culverts across 80 feet ring road in Kormangala ward no.148 Ejipura…"