Bengaluru Public Works Explorer Koramangala

← All works

Solid waste infrastructure · job 151-13-000030

Construction of Dry Waste garbage segregation processing unit at Koramangala industrial area in ward no 151

Completed (final bill) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹1.05 Crpaid, gross
1bills
06 Apr 2016last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Identical Completion Certificate attached to another job number confirmed
    The same file (md5 1943641837…; Completion Certificate) is attached to bills of 2 works: 151-13-000029. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 151-13-000029
  • notice Identical Work Order attached to another job number confirmed
    The same file (md5 f4d8d7ee29…; Work Order) is attached to bills of 2 works: 151-13-000029. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 151-13-000029
  • info Deduction of 39% on a bill confirmed
    ₹4,100,241 withheld from a ₹10,511,760 bill. Usually recoveries, penalties, escrow or security deposit. [source]
  • info Near-identical work under another number (151-13-000032) inferred
    Descriptions are 93% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 151-13-000032
  • info Near-identical work under another number (151-13-000029) inferred
    Descriptions are 97% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
    Related: 151-13-000029

1 · What was planned

Work
Construction of Dry Waste garbage segregation processing unit at Koramangala industrial area in ward no 151 confirmed [1]
Where
Koramangala Industrial Area inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
Technical Manager (South) confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0052 · Technical Manager (South) inferred [1]
Resolved contractor C0052 “Technical Manager (South)”; identifiers: no official identifier in the data; name variants joined by: same registered mobile on BBMP bills (not published) + similar name ×3, same / truncated name ×1. Also appears as: M/s KRIDL, Technical Manager (South), M/s KRIDL,Technical Manager (South).
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×1; Inspection Report ×1; M.B ×4; Quality Certificate ×5; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹1.05 Cr confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹64.12 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
06 Apr 2016 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
06 Apr 2016 confirmed [1]
Latest payment (CBR/RTGS) date
Fines / withheld / recoveries
mobilizationadvance ₹2,664,000 confirmed [1]
Deduction heads recorded in IFMS across this job's bills
Bill → payment (median days)
138 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
13 remark(s); e.g. 2016-04-06: “Approved by CAO — Bill approved for payment and scrutiny report forwarded by EE” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 20 Nov 2015 confirmed [1]
A bill of type “First and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date
Completion certificate date
19 Nov 2014 inferred [1]
Completion date stated in the Completion Certificate (read by OCR from the scanned document)

6 · Physical evidence

Site photos
8 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked; camera dates 2012-11-10 – 2015-07-14 confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 06 Apr 2016 First and Final bill ₹1.05 Cr paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000012 · 20 Nov 2015 — ₹1,05,11,760₹64,11,519 RTGS 000002 06 Apr 2016 Technical Manager (South) BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…garbage segregation processing unit at Koramangala industrial area in ward no 15…"