Bengaluru Public Works Explorer Koramangala

← All works

Drains & storm-water · job 307-23-000079

Construction/Remodelling of primary, secondary drains, culverts/bridges & all other allied works of SWD spread out at various locations in Shanthinagar assembly constituency in Kormanagala valley under GoK grants 2022-23 Package-5 (Action plan numbers 191,192 &193).

Completed (final bill) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹4.08 Crpaid, gross
3bills
13 Apr 2026last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Blank / placeholder file used as a site photo confirmed
    3 photo slot(s) filled with a blank / placeholder file. Bills require before/during/after photos; a placeholder means the photo record for this work is missing. [source] [source]
  • info Bill paid in part (release % below 100) confirmed
    2 bill(s) released partly (75%, 75%). BBMP releases bills in tranches when funds are short; the balance may follow later. [source] [source]
  • info High-value work whose measurement records are unreadable confirmed
    4 MB / bill-form attachments downloaded; none yielded an arithmetic-checked quantity (handwritten or low-quality scans). Quantities for this work cannot be verified from public data.

1 · What was planned

Work
Construction/Remodelling of primary, secondary drains, culverts/bridges & all other allied works of SWD spread out at various locations in Shanthinagar assembly constituency in Kormanagala valley under GoK grants 2022-23 Package-5 (Action plan numbers 191,192 &193). confirmed [1]
Where
Unknown unknown
No place name could be read from the description
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
ALFATH TRADING AND confirmed [1] [2] +1
Payee with the largest billed amount under this job number; also billed: J N PROJECTS PRIVATE
Contractor identity
C0112 · ALFATH TRADING AND confirmed [1] [2] +1
Resolved contractor C0112 “ALFATH TRADING AND”; identifiers: IFMS:035215; name variants joined by: single name variant.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Agreement
EE/SWD/EAST/AGMT/17/ 22-23 dated 2023-02-24 inferred [1]
Contract agreement reference in the Work Order (read by OCR from the scanned document)
Letter of acceptance
EE/ SWD/EAS dated 2023-02-14 inferred [1]
Letter of acceptance reference in the Work Order (read by OCR from the scanned document)

3 · Work documented

Bills recorded
2 running, 1 final paid/registered; 1 unpaid confirmed [1] [2] +2
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; Inspection Report ×2; M.B ×2; Quality Certificate ×3; Road History ×2 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
5 planned items read (Schedule B (contract BOQ)); no billed / measured quantity could be read inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹4.08 Cr confirmed [1] [2] +1
Sum of 3 bill(s) under the job number
Paid (nett)
₹3.69 Cr confirmed [1] [2] +1
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
3 confirmed [1] [2] +1
Unique bills after merging duplicates across exports
First payment
26 Mar 2024 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
13 Apr 2026 confirmed [1]
Latest payment (CBR/RTGS) date
Partial release
2 bill(s) released partly (75%, 75%) confirmed [1] [2]
Release percentage recorded in IFMS (BBMP pays bills in tranches when funds are short)
Unpaid / pending bills
1 bill(s) not paid (₹450,000); at: EE (Acts. Supdt.) ×1 confirmed [1]
Bills present in IFMS without an RTGS payment (drafts or bills awaiting approval); not counted as paid
Bill → payment (median days)
88 confirmed [1]
Median days from bill registration to RTGS payment over 3 IFMS bill(s)
Approval remarks
20 remark(s); e.g. 2025-05-03: “Approved by SC(F)/ZC/CE/CAO — Proceed for further process as per Act Sup Verified.” confirmed [1]
Remarks written by officials in the IFMS approval chain
26 Mar 2024cumulative payments13 Apr 2026

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 07 Jul 2025 confirmed [1]
A bill of type “Second and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)
Placeholder photos
3 photo slot(s) filled with a blank / placeholder file confirmed [1] [2] +1
Photo attachments whose file name says empty/blank or whose file is a few KB

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
oundation complete as per Drawing and Technical Specifications. Tonne Thousand Two Hundredtonne 53.55 ₹1,05,225 — — not billed / not read high [1]
s. The cost includes all lead & lifts, cost of all materials , Cum One Hundred NinetyThreecum 461.41 ₹9,193 — — not billed / not read high [1]
ll lead & lifts, cost of all materials of quality, labour, Usage Cum One Hundred Seventeencum 507.15 ₹7,117 — — not billed / not read high [1]
hnical specification (Batching Plant) Rupees Thirteen Thousand Cum Seven Hundred FourtyOnecum 45.30 ₹13,741 — — not billed / not read high [1]
o Only the full height compacted to a firm condition complete as per drawing and Technicalcum 16.92 ₹1,264 — — not billed / not read high [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 26 Mar 2024 Running bill ₹3.38 L paid source
  2. 05 Aug 2024 Running bill ₹2.12 Cr paid source
  3. 13 Apr 2026 Second and Final bill ₹1.93 Cr paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000310 · 12 Jan 2024 — ₹3,37,500₹3,03,750 RTGS 003463 26 Mar 2024 J N PROJECTS PRIVATE BBMP Work Orders 2023-24 · row 6533
Running 000019 · 09 May 2024 — ₹2,12,26,784₹1,88,18,779 RTGS 004756 05 Aug 2024 ALFATH TRADING AND BBMP Work Orders and Payments 2024-25 (198-ward regime) · row 6495
Second and Final 000079 · 07 Jul 2025 — ₹1,92,63,500₹1,78,06,325 RTGS 000001 13 Apr 2026 ALFATH TRADING AND BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…imary, Secondary and Tertiary drains of Koramangala-Challaghatta Valley in Bengal…"