Improvements and Development of Beauty Spot Park in Koramangala.

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · ddo316 Executive Engineer Major Road South Central Zone
₹1.41 Crcontract / award · inferred
₹1.96 Crpaid, gross
5bills
03 Jul 2019last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

This project is an investigation case (needs RTI).

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Paid 139% of contract value inferred
    Gross payments ₹19,576,212 exceed the contract value ₹14,070,563 by more than GST would explain (work-order values are often quoted excluding 12–18% GST). Variations, work slips, escalation, further work orders under the same job or a longer service period can explain the rest. [source] [source]
  • notice Blank / placeholder file used as a site photo confirmed
    3 photo slot(s) filled with a blank / placeholder file. Bills require before/during/after photos; a placeholder means the photo record for this work is missing. [source] [source]
  • notice Identical Completion Certificate / Job Certificate attached to another job number confirmed
    The same file (md5 66a13bffca…; Completion Certificate, Job Certificate) is attached to bills of 3 works: 304-15-000370, 304-20-000212. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 304-15-000370, 304-20-000212
  • info Same placeholder file uploaded as evidence on several works confirmed
    The same file (md5 af8cd31bb1…; Completion Certificate, Photo - After Work) is attached to bills of 3 works: 304-14-000214, 304-15-000370. A placeholder means the real record is missing. [source]
    Related: 304-14-000214, 304-15-000370

1 · What was planned

Work
Improvements and Development of Beauty Spot Park in Koramangala. confirmed [1]
Where
Unknown unknown
No place name could be read from the description
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
B Y Perumaiah confirmed [1] [2] +1
Payee with the largest billed amount under this job number; also billed: Sri.Perumaiah, M/s Tejus Consultants
Contractor identity
C0034 · B.Y. Perumaiah inferred [1] [2] +1
Resolved contractor C0034 “B.Y. Perumaiah”; identifiers: no official identifier in the data; name variants joined by: same / truncated name ×2. Also appears as: B Y PERUMAIAH, B Y Perumaiah.
Contract value
₹1.41 Cr inferred [1]
Contract / tender price stated in the Work Order (read by OCR from the scanned document)
Work order date
17 Mar 2018 confirmed [1]
Work order date on the bill (order no. 000016)

3 · Work documented

Bills recorded
4 running, 1 final paid/registered confirmed [1] [2] +2
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; Inspection Report ×3; M.B ×3; Quality Certificate ×3; Road History ×3 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
31 planned items read (Estimate); no billed / measured quantity could be read inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹1.96 Cr confirmed [1] [2] +1
Sum of 5 bill(s) under the job number
Paid (nett)
₹1.22 Cr confirmed [1] [2]
Gross minus statutory deductions (tax, security deposit, etc.)
Paid vs contract
139% inferred [1] [2] +1
Gross paid ÷ contract value (contract value is inferred; it may cover only part of the job, e.g. one of several work orders)
Bills
5 confirmed [1] [2] +1
Unique bills after merging duplicates across exports
First payment
20 Mar 2018 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
03 Jul 2019 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
4 confirmed [1]
Median days from bill registration to RTGS payment over 5 IFMS bill(s)
Approval remarks
34 remark(s); e.g. 2019-05-21: “Approved by CAO — Approved for payment as per the verification report” confirmed [1]
Remarks written by officials in the IFMS approval chain
20 Mar 2018cumulative payments03 Jul 2019

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 20 Jun 2019 confirmed [1]
A bill of type “Second and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date
Extensions of time
1 extension-of-time order(s): to 2019-05-10 inferred [1]
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why
Extended completion
10 May 2019 inferred [1]
Latest completion date granted by an extension-of-time order found in IFMS.
↳ from a tender matched to these bills (none confidence) — why

6 · Physical evidence

Site photos
6 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)
Placeholder photos
3 photo slot(s) filled with a blank / placeholder file confirmed [1] [2] +1
Photo attachments whose file name says empty/blank or whose file is a few KB

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
than ft fe s pe sade . the platforms are to be coverd with ryramid Shape FRP roof Thaugend— 3.00 ₹4,80,000 — — not billed / not read medium [1]
th a f Rupees One plate vibrator having tons compaction force thereby forcing Smt Thousandtonne 1,152.05 ₹1,030 — — not billed / not read high [1]
per drawing. The play equipment is to be fitted with Double seated swing for ). Rupees Two— 3.00 ₹2,00,000 — — not billed / not read medium [1]
ty FRP C Lakh material and also high qualty plastic rope climber is to fixed at TwentyFive— 3.00 ₹1,25,000 — — not billed / not read medium [1]
ron laid a_ _ Thousand I dry in front of toe of embankment complete as per drawing Cmt One— 336.15 ₹1,100 — — not billed / not read medium [1]
ast concrete < _- Rupees One Solid blocks with compressive strength not less than Thousand— 304.07 ₹1,001 — — not billed / not read medium [1]
he standard a FA R O specification and direction of the engineer in charge of the eee . ©!— 3.00 ₹1,00,000 — — not billed / not read medium [1]
lain cement Ee Rupees Five Concrete of mix : : with OPC cement @ 220kgs, with Cur Thousand— 51.25 ₹5,000 — — not billed / not read medium [1]
than cms . “ Thausend high, bond stones at two m. apart in each course including Cmt Fivenos 62.09 ₹3,500 — — not billed / not read high [1]
with pigment to / Rupees One , match the shade of the slab, including cost of Smt Thousand— 183.79 ₹1,050 — — not billed / not read medium [1]
ce(excluding cost Thousand ofrough plastered surface which should be measured and Smt Five— 113.97 ₹1,500 — — not billed / not read medium [1]
P :Nylon injection Moulded,, L Lakh BEARING HOUSING AND PIN:Seamless pipe &Round SixtyFive— 1.00 ₹1,65,000 — — not billed / not read medium [1]
and er —— Rupees Sixty other deleterious matter, dressing of sides and bottom, Cmt — Only— 2,398.35 ₹60 — — not billed / not read medium [1]
required ia Rupees Two Smooth rendering, : Providing and removing scaffolding, Smt Hundred— 453.18 ₹220 — — not billed / not read medium [1]
EARING HOUSING AND ral < Eighty PIN Seamless pipe &Round bar,NUT BOLTS CAP:Nylon sr oteand— 1.00 ₹80,000 — — not billed / not read medium [1]
oil for / _\Rupees Two levelling and lowering the ground manually ( other than Cum Hundredcum 178.06 ₹200 — — not billed / not read high [1]
@ .57cum aes fas fie machine mixed, Machine mixed, Concrete laid in layers not cmt Five ,— 7.54 ₹4,500 — — not billed / not read medium [1]
essary oa Thousand i salwood reinforcements for fixing the metal fittings such as Smt Five— 9.45 ₹3,500 — — not billed / not read medium [1]
ht of frame kg ) Thousand R.C.C. top slab with cement concrete : : mix 20mm and Each Sevennos 5.00 ₹4,700 — — not billed / not read high [1]
s, including cost Rupees Nine of all materials, labour, transport charges, HOM of Thousand— 2.00 ₹9,000 — — not billed / not read medium [1]
ne mixed, eae Pa Thousand concrete laid in layers not exceeding cms. thick, well Cum Threecum 3.25 ₹5,300 — — not billed / not read high [1]
basin sia ckets, mm / Thousand ; 16mm C.P brass pillar taps with C.1 M.S bracke © v= Eightm 4.00 ₹3,800 — — not billed / not read high [1]
ing the Rupees Sixty surface to remove all dirt and loose powdered material, free Smt Only— 249.93 ₹60 — — not billed / not read medium [1]
nd with fittings and oa clamps, overflow arrangements with specials and 25mm Bact Thousand— 2.00 ₹5,000 — — not billed / not read medium [1]
pipes and fittings Hundred a7 with one on BRE solvent cement & the cost of cutting Seventy— 35.00 ₹270 — — not billed / not read medium [1]
oard ia _ _ Thousand backing including cost of materials, labour complete as per eat _ One— 4.00 ₹1,100 — — not billed / not read medium [1]
abour and gE _~_ Rupees Nine HOM of equipments with all leads complete as per Each Hundrednos 3.00 ₹900 — — not billed / not read high [1]
labour and yt P< Rupees Four HOM of equipments with all leads complete as per Each Hundrednos 5.00 ₹400 — — not billed / not read high [1]
, labour and we ¢ Rupees Six HOM of equipments with all leads complete as per Each Hundrednos 3.00 ₹600 — — not billed / not read high [1]
stone c Rupees One in CM. : & pointing etc. complete (P.No.254, I.No37.36.1 of ach Hundrednos 10.00 ₹180 — — not billed / not read high [1]
brushing with ready / , Rupees : si enamel priming paint including papel eee smt muennriva— 13.86 ₹25 — — not billed / not read medium [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 17 Mar 2018 Work order issued source
  2. 20 Mar 2018 Running bill ₹68.60 L paid source
  3. 18 Sep 2018 Running bill ₹59.03 L paid source
  4. 06 Feb 2019 Running bill ₹1.98 L paid source
  5. 21 May 2019 Running bill ₹65.93 L paid source
  6. 03 Jul 2019 Second and Final bill ₹22,000 paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000042 · 17 Mar 2018 — ₹68,59,903— RTGS 000426 20 Mar 2018 B Y Perumaiah BBMP work orders under Nagarothana scheme 2016-19 · row 538
Running 000010 · 15 Sep 2018 000016 17 Mar 2018 ₹59,03,000₹57,77,000 RTGS 205 18 Sep 2018 B Y Perumaiah BBMP Bill Register 01-04-2018 to 30-09-2018 · row 5523
Running 000014 · 25 Jan 2019 — ₹1,98,000₹1,78,200 RTGS 000340 06 Feb 2019 M/s Tejus Consultants BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None
Running 000004 · 17 May 2019 — ₹65,93,309₹62,25,106 RTGS 000054 21 May 2019 Sri.Perumaiah BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None
Second and Final 000006 · 20 Jun 2019 — ₹22,000₹19,800 RTGS 000104 03 Jul 2019 M/s Tejus Consultants BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…and Development of Beauty Spot Park in Koramangala.…"