Bengaluru Public Works Explorer Koramangala

← All works

Roads · job 151-16-000025

Asphalting to 1st block Koramangala in ward no151 Koramangala

Running bill only (no final bill found) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹1.70 Crpaid, gross
1bills
29 Dec 2016last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

This project was reviewed for the investigation cases and set aside: why.

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Running bill but no final bill in 3+ years inferred
    Last bill/payment 2016-12-29. The work may be finished with the final bill outside these exports, or stalled. [source] [source]
  • notice Identical Agreement attached to another job number confirmed
    The same file (md5 ff9de57618…; Agreement) is attached to bills of 2 works: 151-16-000019. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 151-16-000019
  • notice Identical Agreement attached to another job number confirmed
    The same file (md5 98599726af…; Agreement) is attached to bills of 2 works: 151-16-000019. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 151-16-000019
  • notice Identical Work Order attached to another job number confirmed
    The same file (md5 8638511742…; Work Order) is attached to bills of 2 works: 151-16-000019. Could be one contract booked under two job numbers, or a wrong upload — worth checking. [source]
    Related: 151-16-000019

1 · What was planned

Work
Asphalting to 1st block Koramangala in ward no151 Koramangala confirmed [1]
Where
1st Block Koramangala inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
Sri. Ramaiah Lokesh confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0028 · Sri. Ramaiah Lokesh confirmed [1]
Resolved contractor C0028 “Sri. Ramaiah Lokesh”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched

3 · Work documented

Bills recorded
1 running, 0 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×1; Inspection Report ×1; M.B ×7; Quality Certificate ×31; Road History ×4 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
2 of 14 planned items compared (Schedule B (contract BOQ) vs bill abstracts); median quantity difference -94% inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹1.70 Cr confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹1.57 Cr confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
29 Dec 2016 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
29 Dec 2016 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
62 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
11 remark(s); e.g. 2016-12-24: “Approved by CAO — Approved for payment as per the verification report.” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Running bill only (no final bill found) inferred [1]
Latest bill is a part (running) bill; no final bill in the published data
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Completed on
Unknown unknown
No final bill found

6 · Physical evidence

Site photos
6 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked; camera dates 2016-11-27 – 2016-11-27 confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
t mix to work site, laying with a hydrostatic paver finisher Cum mises Nike Thousand Niae,cum 2,310.32 ₹9,900 — — not billed / not read high [1]
with CM : plastering and finishing cutting, including formwork, curing, Rapess er a Forty— 16,971.00 ₹340 955.00 -94% bill form total up to date medium [1] [2]
r : edges of stones chistle dressed in courses not less than Cum Rupees Five Thousand Onlycum 895.14 ₹5,000 — — not billed / not read high [1]
acting with plate vibrator having tons compaction force thereby Sqm Rupes One Thousand TW9sqm 967.50 ₹1,200 — — not billed / not read high [1]
h blocks of size 40x10x20cems. ( Ixbxh ) conforming to LS : / in Rupees Eight Hundred Onlyls 1,055.00 ₹800 — — not billed / not read high [1]
tor, HOM of machinery, screed vibratory, power floater, blade Sqm Rupees Ninety Seven Onlysqm 6,188.00 ₹97 — — not billed / not read high [1]
to meters and an average lift upto m, excavated surface Cum Rupees One Hundred Eighty Fivecum 2,432.22 ₹185 — — not billed / not read high [1]
nd anchoring to the adjoining members Wherever necessary’ mt . Rupees Seventy Two Thousand— 6.21 ₹72,000 — — not billed / not read medium [1]
w upto meters and an average lift upto m, excavated surface Cum Rupees Two Hundred Seventycum 1,033.45 ₹270 — — not billed / not read high [1]
ding the chain link with M.S. block pipe including cost of all Rupees Three Hundred Thirtym 720.00 ₹338 — — not billed / not read high [1]
rface such as suspended floors, roofs, landings, balconies sqm Rupees Three Hundred Thirtysqm 611.52 ₹330 — — not billed / not read high [1]
en shade after preparing the surface after throughly cleaning oil, dirt, Rupees Fifty Only— 2,672.95 ₹50 156.56 -94% bill form total up to date medium [1] [2]
required including cost of all materials, labour, lead and lifts, upees Six Hundred Ninety— 180.00 ₹697 — — not billed / not read medium [1]
danger lighting atc.,in the Cement concrete road. P- Cum Rupees Six Hundred Fifteen Only —cum 66.00 ₹615 — — not billed / not read high [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 29 Dec 2016 Running bill ₹1.70 Cr paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000261 · 28 Oct 2016 — ₹1,69,86,002₹1,57,29,920 RTGS 000162 29 Dec 2016 Sri. Ramaiah Lokesh BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…Asphalting to 1st block Koramangala in ward no151 Koramangala…"