Bengaluru Public Works Explorer Koramangala

← All works

Roads · job 151-16-000018

Improvements to park and construction of reading room gazebo at Lakshmi devi park in 6th block 80 road koramangala in ward no 151

Running bill only (no final bill found) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹35.18 Lpaid, gross
2bills
01 Jun 2017last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
Tender BBMP/2015-16/OW/WORK_INDENT21005 tender ↔ bills linked by matching (high confidence)

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice Running bill but no final bill in 3+ years inferred
    Last bill/payment 2017-06-01. The work may be finished with the final bill outside these exports, or stalled. [source] [source]
  • info Fine / penalty deducted from a bill confirmed
    IFMS deductions: fine ₹1,686. Penalties usually relate to delay or quality; their reason is not in the public record. [source]

1 · What was planned

Work
Improvements to park and construction of reading room gazebo at Lakshmi devi park in 6th block 80 road koramangala in ward no 151 confirmed [1]
Where
6th Block inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1] [2]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
29 Feb 2016 inferred [1]
Date the first call of the tender was published
↳ from a tender matched to these bills (high confidence) — why
Tender calls
1 (first call) inferred [1]
Tender awarded/listed on its first call
↳ from a tender matched to these bills (high confidence) — why
Time allowed
Unknown unknown
Tender document not available or period not stated

2 · Who got the work (contract)

Contractor
P.Suresh kumar confirmed [1] [2]
Payee with the largest billed amount under this job number
Contractor identity
C0074 · P.Suresh kumar inferred [1] [2]
Resolved contractor C0074 “P.Suresh kumar”; identifiers: no official identifier in the data; name variants joined by: same / truncated name ×1. Also appears as: SRI P SURESH KUMAR.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
26 Aug 2016 confirmed [1]
Work order date on the bill (order no. WO-000063)

3 · Work documented

Bills recorded
1 running, 0 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Inspection Report ×1; M.B ×1; Quality Certificate ×1; Road History ×1 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹35.18 L inferred [1] [2]
Sum of 2 bill(s) under the job number; some 2010-18 register rows were de-duplicated by matching amounts, so the total may include a repeat
Paid (nett)
₹30.67 L inferred [1] [2]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
2 confirmed [1] [2]
Unique bills after merging duplicates across exports
First payment
01 Jun 2017 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
01 Jun 2017 confirmed [1]
Latest payment (CBR/RTGS) date
Fines / withheld / recoveries
fine ₹1,686 confirmed [1]
Deduction heads recorded in IFMS across this job's bills
Bill → payment (median days)
45 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
7 remark(s); e.g. 2017-06-01: “Approved by CAO — Approved for payment as per the verification report” confirmed [1]
Remarks written by officials in the IFMS approval chain
26 Aug 2016cumulative payments01 Jun 2017

5 · Completion

Status
Running bill only (no final bill found) inferred [1]
Latest bill is a part (running) bill; no final bill in the published data
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Completed on
Unknown unknown
No final bill found

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)
Satellite imagery
Location could not be pinned down inferred [1] [2]
Manual comparison of satellite captures 2016-02-05 (GeoEye-1, 0.46 m) → 2017-01-17 (WV02, 0.5 m) around the geocoded point: Lakshmi Devi Park is not in OSM; the fallback is the 6th Block centroid. A park reading room and gazebo are too small to find without exact coordinates. Experimental: location is geocoded from place names in the description, captures are not perfectly co-registered, and small works (drains, footpaths) are below what 0.3–0.6 m imagery can show.

Timeline

  1. 29 Feb 2016 Tender BBMP/2015-16/OW/WORK_INDENT21005 published inferred source
  2. 26 Aug 2016 Work order issued source
  3. 26 Aug 2016 Bill ₹17.59 L (register entry) source
  4. 01 Jun 2017 Running bill ₹17.59 L paid source

Tender notices

Tender no.SourcePublishedStatusEstimateAwardedToTime allowedLinkEvidence
BBMP/2015-16/OW/WORK_INDENT21005BBMP list29 Feb 2016Tender published (outcome not in this list) ——— —high record · row 2103

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
— — WO-000063 26 Aug 2016 ₹17,58,852₹15,33,303 — P.Suresh kumar BBMP Work Order Data Zone-6-South (2015-18) · row 1615 dedupe by amount
Running 008 — ₹17,58,852₹15,33,303 RTGS 000083 01 Jun 2017 P.Suresh kumar BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)