Buildings & civic facilities · job 151-17-000099
Constrcution of Govt.School and multi purpose building in Mestry palya, 4th B block Koramangala in ward No.151
₹1.30 Crcontract / award · inferred
₹1.36 Crpaid, gross
2bills
10 Mar 2026last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
no tender found for these bills
Signals — patterns worth a closer look, not findings of wrongdoing
-
notice 1 bill(s) registered after the final bill confirmed
Final bill registered 2023-01-07; later non-final bills exist. [source]
- info Fine / penalty deducted from a bill confirmed
-
info Bill paid in part (release % below 100) confirmed
1 bill(s) released partly (75%). BBMP releases bills in tranches when funds are short; the balance may follow later. [source]
-
info Median 816 days from bill registration to payment confirmed
Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
1 · What was planned
Work
Constrcution of Govt.School and multi purpose building in Mestry palya, 4th B block Koramangala in ward No.151
confirmed [1]
Where
4th B Block Koramangala
inferred
Place names read from the work description text
Estimated cost
Unknown
unknown
No estimate published for this work in the sources used
Tender published
Unknown
unknown
No tender found or matched for this work
Time allowed
Unknown
unknown
No tender document found or matched
2 · Who got the work (contract)
Contractor
Contractor identity
C0097 · T GOPINATH REDDY
confirmed [1] [2]
Resolved contractor C0097 “T GOPINATH REDDY”; identifiers: IFMS:022983; name variants joined by: single name variant.
Contract value
₹1.30 Cr
inferred [1]
Contract / tender price stated in the Work Order (read by OCR from the scanned document)
3 · Work documented
Bills recorded
Work documents
Quantities: planned vs billed
74 planned items read (Schedule B (contract BOQ)); no billed / measured quantity could be read
inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why
4 · Money paid
Paid (nett)
Paid vs contract
First payment
Last payment
Partial release
1 bill(s) released partly (75%)
confirmed [1]
Release percentage recorded in IFMS (BBMP pays bills in tranches when funds are short)
Fines / withheld / recoveries
Unpaid / pending bills
1 bill(s) not paid (₹108,950); at: SC(F) / CE ×1
confirmed [1]
Bills present in IFMS without an RTGS payment (drafts or bills awaiting approval); not counted as paid
Bill → payment (median days)
Approval remarks
23 remark(s); e.g. 2025-08-14: “Approved by SC(F)/ZC/CE/CAO”
confirmed [1]
Remarks written by officials in the IFMS approval chain
10 Oct 2024cumulative payments10 Mar 2026
5 · Completion
Status
Completed (final bill)
inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown
unknown
Actual start date is not published
Expected completion
Unknown
unknown
Stipulated period of completion not found in any public record
Final bill
Completed on
Unknown
unknown
Final bill does not carry an end date
Extensions of time
1 extension-of-time document(s) attached; no extended date could be read
inferred [1]
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why
6 · Physical evidence
Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used
| Item | Unit | Planned | Rate | Billed / measured | Difference | Basis | Confidence | Source |
|---|---|---|---|---|---|---|---|---|
| anchoring to the adjoining memebrs wherever necessary complete as onnd Rupees Ninety Eight | — | 12.36 | ₹98,000 | — | — | not billed / not read | medium | [1] |
| d staircase, lintles and beams retaining walls, return walls, walls (any Cum a Hundred Ont | cum | 121.48 | ₹7,500 | — | — | not billed / not read | high | [1] |
| nd anchoring to the adjoining memebrs wherever necessary complete as J Rupees Ninety Eight | — | 5.90 | ₹98,000 | — | — | not billed / not read | medium | [1] |
| ngs, balconies an likes, thickness upto mm including cost of all materials, labour ated Ou | — | 1,047.60 | ₹446 | — | — | not billed / not read | medium | [1] |
| ite %, — ; The granite materials are laid on existing bed of CM : 20mm thick Rupees wo ete | — | 178.08 | ₹2,500 | — | — | not billed / not read | medium | [1] |
| usand and Nos of 25mm dia. Stainless steel hollow horizontal pipe are sqm Six Hundred Only | sqm | 66.40 | ₹6,600 | — | — | not billed / not read | high | [1] |
| aircase, lintles and beams retaining walls, return walls, walls (any Cum Four Hundred Only | cum | 56.67 | ₹7,400 | — | — | not billed / not read | high | [1] |
| ase, lintles and beams retaining walls, return walls, walls (any Cum Rupees Seven Thousand | cum | 52.59 | ₹7,300 | — | — | not billed / not read | high | [1] |
| ing, watering, including cost of all materials and labour with all Cum Rupees Two Thousand | cum | 139.25 | ₹2,700 | — | — | not billed / not read | high | [1] |
| housand of 39x75 mm with reinforcement of .5mm thickness. Glazing bead for Two Hundred Onl | — | 59.04 | ₹6,200 | — | — | not billed / not read | medium | [1] |
| sand a per IS aises including cost of all materials, labour charegs, One Hundred Fifty One | — | 249.00 | ₹1,151 | — | — | not billed / not read | medium | [1] |
| olygon in plan including cost of all materials, labour complete as per Rupees Five Hundned | — | 422.40 | ₹547 | — | — | not billed / not read | medium | [1] |
| One Thousand confirming to IS (Part) : and constructed with CM : as sam One Hundred Ninety | — | 174.39 | ₹1,190 | — | — | not billed / not read | medium | [1] |
| n, drawing including cutting steel sections and welding the same to kgs Rupees One Hundred | kg | 1,296.54 | ₹114 | — | — | not billed / not read | high | [1] |
| using , F different grade sand papers, including cost of all materials, cos of sqm ane von | sqm | 1,490.08 | ₹94 | — | — | not billed / not read | high | [1] |
| including dressing the bottom and sides of pits and trenches, stacking) Cum “Ty Hist Only | cum | 324.48 | ₹358 | — | — | not billed / not read | high | [1] |
| oved make and size including cost of materials, labour, complete as sqm Five Hundred Forty | sqm | 72.20 | ₹1,541 | — | — | not billed / not read | high | [1] |
| ourses not less than cms high, bond stones at two m, apart in each Cum Seven Hundred Forty | cum | 15.20 | ₹6,747 | — | — | not billed / not read | high | [1] |
| other een matter including Preparing the surface even and sand paper sam eal eee ire: irra | — | 924.75 | ₹108 | — | — | not billed / not read | medium | [1] |
| d Jof 25mm thick including cost of materials, labour, HOM of machineries One Hundred Forty | — | 16.06 | ₹5,148 | — | — | not billed / not read | medium | [1] |
| f 25mm thick including cost of materials, labour, HOM of machineries sqm One Hundred Forty | sqm | 16.06 | ₹5,144 | — | — | not billed / not read | high | [1] |
| Thousand complete es per eee materials, labour, HOM of machineries sqm One Hundred Thirty | sqm | 16.06 | ₹5,139 | — | — | not billed / not read | high | [1] |
| usand phase AC supply conforming to ISS- - and with double ball each Three Hundred Twenty! | nos | 34.00 | ₹2,320 | — | — | not billed / not read | high | [1] |
| ETENEE ete of iibteriale labour sie a a ing Scaffolding, including cost Rupees Two Hundred | — | 279.05 | ₹256 | — | — | not billed / not read | medium | [1] |
| e Hendred smooth, cost of materials, labour, complete as per specifications. Extra sqm I ‘ | sqm | 565.33 | ₹114 | — | — | not billed / not read | high | [1] |
| mooth rendering, ; Providing and removing scaffolding, including cost Rupees Three Hundred | — | 181.35 | ₹332 | — | — | not billed / not read | medium | [1] |
| make and size including cost of materials, labour, complete as sqm Five Hundred Forty Six | sqm | 35.89 | ₹1,546 | — | — | not billed / not read | high | [1] |
| Smooth rendering, : Providing and removing scaffolding, including cost Rupees Two Hundred | — | 200.83 | ₹269 | — | — | not billed / not read | medium | [1] |
| ooth rendering, : Providing and removing scaffolding, including cost of Rupees Two Hundred | — | 181.47 | ₹294 | — | — | not billed / not read | medium | [1] |
| 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom sqm Three Hundred Twenty | sqm | 15.75 | ₹3,329 | — | — | not billed / not read | high | [1] |
| mooth rendering, : Providing and removing scaffolding, including cost o Rupees Two Hundred | — | 183.68 | ₹281 | — | — | not billed / not read | medium | [1] |
| mooth rendering, ; Providing and removing scaffolding, including cost Rupees Three Hundred | — | 159.15 | ₹318 | — | — | not billed / not read | medium | [1] |
| ircase, lintles and beams retaining walls, return walls, walls (any Cum Two Hundred Ninety | cum | 5.99 | ₹8,292 | — | — | not billed / not read | high | [1] |
| d smooth rendering, : Providing and removing scaffolding, including cost Rupees bd Hundred | — | 160.77 | ₹305 | — | — | not billed / not read | medium | [1] |
| and diameter flush bend with fittings and clamps, overflow arrangements Nine Hundred Forty | — | 8.00 | ₹5,941 | — | — | not billed / not read | medium | [1] |
| ees One Thousand confirming to IS (Part) : and constructed with CM : as Two Hundred Twenty | — | 36.29 | ₹1,229 | — | — | not billed / not read | medium | [1] |
| ess, including attached pilasters, buttresses, plinth cills and string Rupees Four Hundred | — | 92.57 | ₹429 | — | — | not billed / not read | medium | [1] |
| anite Thousand Nine metal inside plastering 12mm thick with cement mortar : finished Nos . | nos | 3.00 | ₹11,954 | — | — | not billed / not read | high | [1] |
| pipes and fittings with one step CPVC solvent cement & the cost of mtr i ai Three Huniired | m | 100.00 | ₹351 | — | — | not billed / not read | high | [1] |
| piral Rupees Six Hundred Staircase including cost of all materials, labour complete as per | — | 41.76 | ₹623 | — | — | not billed / not read | medium | [1] |
Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.
Timeline
Bills & payments (BBMP)
| Bill type | Bill reg. (BR) | Work order | Gross | Nett | Payment | Payee | Source |
|---|---|---|---|---|---|---|---|
| First and Final | 000151 · 07 Jan 2023 | — | ₹1,18,000 | ₹1,06,200 | RTGS 001998 10 Oct 2024 | H & P CONSULTANTS | BBMP Work Orders and Payments 2024-25 (198-ward regime) · row 4578 |
| Running | 000097 · 15 Dec 2023 | — | ₹1,34,49,114 | ₹1,28,45,157 | RTGS 000285 10 Mar 2026 | T GOPINATH REDDY | BBMP Work Orders and Payments 2025-26 (198-ward regime) · row 4649 |
Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.
Why this is a Koramangala project