Roads, drains & footpaths (combined) · job 151-17-000093
Improvements to road, drains and footpath in 5th A block, Koramangala and surrounding areas in Ward No.151 Koramangala
—contract / award · unknown
₹37.41 Lpaid, gross
1bills
14 Aug 2019last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
Tender BBMP/2017-18/OW/WORK_INDENT27449
tender ↔ bills linked by matching (medium confidence)
Signals — patterns worth a closer look, not findings of wrongdoing
-
info Median 507 days from bill registration to payment confirmed
Long payment delays are common (seniority-based bill clearance) and raise contractors' financing costs. [source]
-
info Near-identical work under another number (151-22-000002) inferred
Descriptions are 90% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 151-22-000002 -
info Near-identical work under another number (151-19-000031) inferred
Descriptions are 85% similar. Could be a recurring annual work, a re-tender, a split of one work, or a duplicate entry.
Related: 151-19-000031
1 · What was planned
Work
Improvements to road, drains and footpath in 5th A block, Koramangala and surrounding areas in Ward No.151 Koramangala
confirmed [1]
Where
5th A Block, Koramangala
inferred
Place names read from the work description text
Ward
Estimated cost
Tender published
Tender calls
Time allowed
Unknown
unknown
Tender document not available or period not stated
2 · Who got the work (contract)
Contractor
Contractor identity
C0181 · N Santosh
confirmed [1]
Resolved contractor C0181 “N Santosh”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown
unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
3 · Work documented
Bills recorded
0 running, 1 final paid/registered
confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
4 · Money paid
Paid (gross)
Paid (nett)
Bills
First payment
Last payment
Bill → payment (median days)
Approval remarks
13 remark(s); e.g. 2019-08-16: “Approved by CAO — ಟಿ.ವಿ.ಸಿ.ಸಿರವರ ಅನುಮೋದನೆ ಮೇರೆಗೆ ಸದರಿ ಬಿಲ್ಲನ್ನು ಅನುಮೋದಿಸಿದೆ.”
confirmed [1]
Remarks written by officials in the IFMS approval chain
5 · Completion
Status
Completed (final bill)
inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Expected completion
Unknown
unknown
Stipulated period of completion not found in any public record
Final bill
Completed on
6 · Physical evidence
Site photos
1 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked
confirmed [1]
Photos attached to the bills in IFMS (type as labelled by the uploader)
Timeline
How the tender and the bills were connected
Tenders and BBMP bills share no common number, so connections are inferred from independent evidence. Accepted links feed the facts above (marked inferred); possible ones are listed only for review and change nothing.
Linked ·
BBMP/2017-18/OW/WORK_INDENT27449 (BBMP tender list 2013–18) ·
confidence medium · description similarity 82%
“Improvements to road, drains and footpath in 5th A Block Koramagnala and Surrounding areas in ward No. 151 Koramangala” source
✓ same kind of work (drain, footpath, road) · same place(s): block5 · ward numbers agree · bills start 88 days after tender · paid is 94% of tender value · same engineering division
Possible — not merged ·
BBMP/2015-16/OW/WORK_INDENT20685 (BBMP tender list 2013–18) ·
confidence possible · description similarity 64%
“Comprehensive Development of Roads, drains and Footpaths in Ward No: 147, 148, 151 and 173 in Koramangala Sub division, BTM Layout Division,” source
✓ same kind of work (drain, footpath, road) · ward numbers agree · bills start 721 days after tender · same engineering division
✗ paid is 4% of tender value
Possible — not merged ·
BBMP/2017-18/OW/WORK_INDENT27425 (BBMP tender list 2013–18) ·
confidence possible · description similarity 47%
“Improvements to drains in New Model Harijana Colony, Koramangala 8th Block in ward No. 147 (Adugodi)” source
✓ same kind of work (drain) · bills start 89 days after tender · same engineering division
✗ different places named (adugodi, block8 vs block5) · ward numbers differ (tender 147, 176)
Tender notices
| Tender no. | Source | Published | Status | Estimate | Awarded | To | Time allowed | Link | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| BBMP/2017-18/OW/WORK_INDENT27449 | BBMP list | 02 Nov 2017 | Tender published (outcome not in this list) | ₹39.79 L | — | — | — | medium | record · row 3412 |
Bills & payments (BBMP)
| Bill type | Bill reg. (BR) | Work order | Gross | Nett | Payment | Payee | Source |
|---|---|---|---|---|---|---|---|
| Final | 000181 · 30 Mar 2018 | 000188 24 Mar 2018 | ₹37,40,732 | ₹33,90,328 | 004496 14 Aug 2019 | N Santosh | BBMP Work Orders - Koramangala (Ward 151), 2013-2022 · row 103 |
Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.
Why this is a Koramangala project
Booked to Koramangala ward (151 under the 198-ward map)