Bengaluru Public Works Explorer Koramangala

← All works

Roads, drains & footpaths (combined) · job 151-23-000003

Comprehensive Development and Asphalting to roads and Construction of RCC Drains, Culvert, Cobble stone pavers and Footpath improvements and other Development works at 7th Block Koramangala (Balance roads), 10th to 17th cross roads and surrounding area in Muniswamy Gowda road, Ashwini layout, Yellamma Temple, VGS Temple, Stanley House roads in Ejipura, 5th and 3rd Block in Koramangala, HSR Layout 6th sector, behind Metro Station and Electrical Srinivasa House roads in Jakkasandra in ward No.147, 148, 151 and 173 (Package No. 03)

Completed (final bill) Bruhat Bengaluru Mahanagara Palike
₹8.94 Crcontract / award · inferred
₹10.13 Crpaid, gross
5bills
23 Aug 2024last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

This project was reviewed for the investigation cases and set aside: why.

Signals — patterns worth a closer look, not findings of wrongdoing

  • notice 1 bill(s) registered after the final bill confirmed
    Final bill registered 2023-02-23; later non-final bills exist. [source]
  • info 72% of payments made in the last fortnight of March confirmed
    Payments bunched at financial-year end (budget lapse pressure) are common; worth checking that measurement of the work preceded payment. [source] [source]
  • info Bill paid in part (release % below 100) confirmed
    4 bill(s) released partly (75%, 75%, 75%). BBMP releases bills in tranches when funds are short; the balance may follow later. [source] [source]
  • info Billed quantities identical to Schedule B (3 items) inferred
    in uniform lay on with. moter ll r a Cum Seven Hundred Sixty — 216 cum; level and alignment, rolling with smooth Cum Thousand Seven — 1,205.16 cum; g levelling the formwork as per drawing), Five Hundred Fifty — 135.36 . Executed quantity up to date equals the tendered quantity to the decimal. Auditors commonly check such items to confirm measurements were taken on site; it can also be legitimate (quantities fixed by drawings, items measured once). [source] [source]
  • info Contractor holds 5% of Koramangala money (3 projects) confirmed
    C0026 LOKESH R (identity confirmed; ids: IFMS:022698): ₹345,262,807 across 3 projects in this dataset. Concentration is common for ward maintenance contracts; it is context, not a finding.
    Related: 174-25-000008, 147-20-000061

1 · What was planned

Work
Comprehensive Development and Asphalting to roads and Construction of RCC Drains, Culvert, Cobble stone pavers and Footpath improvements and other Development works at 7th Block Koramangala (Balance roads), 10th to 17th cross roads and surrounding area in Muniswamy Gowda road, Ashwini layout, Yellamma Temple, VGS Temple, Stanley House roads in Ejipura, 5th and 3rd Block in Koramangala, HSR Layout 6th sector, behind Metro Station and Electrical Srinivasa House roads in Jakkasandra in ward No.147, 148, 151 and 173 (Package No. 03) confirmed [1]
Where
7th Block Koramangala; 17th Cross Road; Ejipura; 3rd Block; Jakkasandra inferred
Place names read from the work description text
Ward
151 (198-ward map) confirmed [1] [2]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
LOKESH R confirmed [1] [2] +1
Payee with the largest billed amount under this job number; also billed: TECHNOART CONSULTANT, ROAD INVENTO CONSULT
Contractor identity
C0026 · LOKESH R confirmed [1] [2] +1
Resolved contractor C0026 “LOKESH R”; identifiers: IFMS:022698; name variants joined by: single name variant.
Contract value
₹8.94 Cr inferred [1]
Contract / tender price stated in the Work Order (read by OCR from the scanned document)

3 · Work documented

Bills recorded
2 running, 3 final paid/registered confirmed [1] [2] +2
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×3; M.B ×5; Quality Certificate ×4 confirmed [1] [2] +1
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
12 of 22 planned items compared (Schedule B (contract BOQ) vs bill abstracts); median quantity difference -6% inferred [1] [2] +4
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹10.13 Cr confirmed [1] [2] +1
Sum of 5 bill(s) under the job number
Paid (nett)
₹9.18 Cr confirmed [1] [2] +1
Gross minus statutory deductions (tax, security deposit, etc.)
Paid vs contract
113% inferred [1] [2] +1
Gross paid ÷ contract value (contract value is inferred; it may cover only part of the job, e.g. one of several work orders)
Bills
5 confirmed [1] [2] +1
Unique bills after merging duplicates across exports
First payment
30 Mar 2023 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
23 Aug 2024 confirmed [1]
Latest payment (CBR/RTGS) date
Partial release
4 bill(s) released partly (75%, 75%, 75%) confirmed [1] [2] +1
Release percentage recorded in IFMS (BBMP pays bills in tranches when funds are short)
Bill → payment (median days)
231 confirmed [1]
Median days from bill registration to RTGS payment over 5 IFMS bill(s)
Approval remarks
39 remark(s); e.g. 2025-01-21: “Approved by SC(F)/ZC/CE/CAO — Approved.” confirmed [1]
Remarks written by officials in the IFMS approval chain
30 Mar 2023cumulative payments23 Aug 2024

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 25 Jan 2024 confirmed [1]
A bill of type “Second and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date

6 · Physical evidence

Site photos
6 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
inisher to the required grade, level and alignment, rolling with smooth Cum Thousand Sevencum 1,205.16 ₹12,700 1,205.16 +0% bill abstracts (sum of read bills) medium [1] [2]
y Two ! ; Foundation / Substructure / Superstructure complete as per Drawing Thousand Four— 112.93 ₹92,473 70.88 -37% bill abstracts (sum of read bills) medium [1] [2]
site, laying in uniform layers with paver/grader in sub-base / Cum Six Sa dred Fifty Onlycum 3,571.41 ₹2,650 — — not billed / not read high [1]
ying with mechanical paver finisher to the required grade, level and ailment Cum napeas eecum 843.56 ₹11,000 830.59 -2% bill abstracts (sum of read bills) high [1] [2]
quality confirming to the requirements of relevant Is codes + 100s Cum Three Hundred Fiftycum 878.65 ₹7,355 — — not billed / not read high [1]
sand *™ forcing part of sand underneath to come up in between joints "eu Two Hundred Sixty— 3,076.00 ₹1,260 2,407.19 -22% bill abstracts (sum of read bills) medium [1] [2]
le °' per specification and Directions of Engineer In Charge of each Thousand Five Hundrednos 77.00 ₹47,500 — — not billed / not read high [1]
Thousand steel plates including levelling the formwork as per drawing), Five Hundred Fifty— 135.36 ₹7,550 135.36 +0% bill abstracts (sum of read bills) medium [1] [2]
pees Two Hundred = Surfaced Road A Taking output t load and lead km = tkm. Cum “"P Ouly uncum 4,505.76 ₹200 3,453.64 -23% bill abstracts (sum of read bills) high [1] [2]
oading Charges) complete as per Specification and Directions of Sqm Fifty seven and Thirtysqm 5,354.95 ₹157 730.20 -86% bill abstracts (sum of read bills) high [1] [2]
red — excavated surface leveled and sides neatly dressed disposing off the Cum owiees Onlycum 3,067.50 ₹214 2,338.85 -24% bill abstracts (sum of read bills) high [1] [2]
oisture content to be determined during trial length construction, Cum Eight Hundred Fortycum 135.36 ₹4,845 — — not billed / not read high [1]
ees One Hundred Surfaced Road A Taking output t load and lead km = t.km. Cum "Nine Six Onlcum 3,092.90 ₹196 2,895.67 -6% bill abstracts (sum of read bills) high [1] [2]
usand '° work site, spreading in uniform lay on with. moter ll r a Cum Seven Hundred Sixtycum 216.00 ₹2,767 216.00 +0% bill form total up to date medium [1] [2]
rea R Ninety and _ Loading Charges) complete as per Specification and Directions of m naarm 4,142.68 ₹90 449.65 -89% bill abstracts (sum of read bills) medium [1] [2]
of quality, labour, Usage charges of machineries, curing, and Cum _ Eight Hundred Forty .cum 49.27 ₹6,843 466.27 +846% bill abstracts (sum of read bills) medium [1] [2]
j N Eight in all shades — plastered concrete surfaces complete as per Sqm Rupees Ouly. 'gsqm 2,474.68 ₹98 — — not billed / not read high [1]
ees wo hun Specification and Directions of Engineer In Charge of The Work Sqm Sixteen Onlysqm 465.00 ₹216 — — not billed / not read high [1]
ize of cms thick and fixed in cement mortar ( : ) including fixing Sqm Rupees Nine Hundredsqm 40.00 ₹950 — — not billed / not read high [1]
. specifications ( On,y Chamfered length Shall be recorded) as per the Rupees Eighty Eight— 251.60 ₹88 — — not billed / not read medium [1]
one masonry as per specifications . complete as per Specification and Sqm Mupee en Hundredsqm 40.00 ₹132 — — not billed / not read high [1]
e including dressing of excavated surfaces, disposing off or levelling the Cum Rupees Galecum 25.40 ₹75 — — not billed / not read high [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 30 Mar 2023 Running bill ₹7.23 Cr paid source
  2. 30 Dec 2023 First and Final bill ₹4.93 L paid source
  3. 28 Mar 2024 Running bill ₹5.25 L paid source
  4. 18 Jun 2024 Second and Final bill ₹2.76 Cr paid source
  5. 23 Aug 2024 Second and Final bill ₹3.50 L paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000147 · 31 Dec 2022 — ₹7,23,40,492₹6,47,12,660 RTGS 001483 30 Mar 2023 LOKESH R BBMP Work Orders 2022-23 · row 5849
First and Final 000177 · 23 Feb 2023 — ₹4,93,000₹4,43,700 RTGS 001166 30 Dec 2023 ROAD INVENTO CONSULT BBMP Work Orders 2023-24 · row 4789
Running 000033 · 11 Jul 2023 — ₹5,25,000₹4,72,500 RTGS 001389 28 Mar 2024 TECHNOART CONSULTANT BBMP Work Orders 2023-24 · row 6687
Second and Final 000077 · 31 Oct 2023 — ₹2,76,20,697₹2,58,41,626 RTGS 001627 18 Jun 2024 LOKESH R BBMP Work Orders and Payments 2024-25 (198-ward regime) · row 4556
Second and Final 000115 · 25 Jan 2024 — ₹3,50,000₹3,15,000 RTGS 001949 23 Aug 2024 TECHNOART CONSULTANT BBMP Work Orders and Payments 2024-25 (198-ward regime) · row 4574

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Booked to Koramangala ward (151 under the 198-ward map)