Drains & storm-water · job 307-19-000015

Detailed estimate for maintenance desilting of all storm water drains in Koramangala Zone

Completed (final bill) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹3.11 Crpaid, gross
4bills
04 Aug 2021last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
no tender found for these bills

Signals — patterns worth a closer look, not findings of wrongdoing

  • info High-value work whose measurement records are unreadable confirmed
    8 MB / bill-form attachments downloaded; none yielded an arithmetic-checked quantity (handwritten or low-quality scans). Quantities for this work cannot be verified from public data.

1 · What was planned

Work
Detailed estimate for maintenance desilting of all storm water drains in Koramangala Zone confirmed [1]
Where
Unknown unknown
No place name could be read from the description
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
Unknown unknown
No tender found or matched for this work
Time allowed
Unknown unknown
No tender document found or matched

2 · Who got the work (contract)

Contractor
M/s R K Brothers Infraprop Proventures Private Limited confirmed [1]
Payee with the largest billed amount under this job number; also billed: M/s Preethi Cad Consulting Engineers Pvt Ltd
Contractor identity
C0075 · M/s R K Brothers Infraprop Proventures Private Limited confirmed [1]
Resolved contractor C0075 “M/s R K Brothers Infraprop Proventures Private Limited”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched

3 · Work documented

Bills recorded
2 running, 2 final paid/registered confirmed [1] [2] +2
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×4; Inspection Report ×4; M.B ×4; Quality Certificate ×5; Road History ×4 confirmed [1] [2] +2
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)
Quantities: planned vs billed
5 planned items read (Schedule B (contract BOQ)); no billed / measured quantity could be read inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why

4 · Money paid

Paid (gross)
₹3.11 Cr confirmed [1]
Sum of 4 bill(s) under the job number
Paid (nett)
₹2.96 Cr confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
4 confirmed [1]
Unique bills after merging duplicates across exports
First payment
03 May 2019 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
04 Aug 2021 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
25 confirmed [1]
Median days from bill registration to RTGS payment over 4 IFMS bill(s)
Approval remarks
34 remark(s); e.g. 2021-08-04: “Approved by AdCF — Approved as per the verification report of CE TVCC and the recommendation of cao As” confirmed [1]
Remarks written by officials in the IFMS approval chain
03 May 2019cumulative payments04 Aug 2021

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 28 Dec 2020 confirmed [1]
A bill of type “First and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date
Extensions of time
2 extension-of-time document(s) attached; no extended date could be read inferred [1] [2]
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why

6 · Physical evidence

Site photos
36 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +2
Photos attached to the bills in IFMS (type as labelled by the uploader)

Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used

ItemUnitPlannedRateBilled / measuredDifferenceBasisConfidenceSource
h 20mm and down size graded granite Metab GGalss SEStS89° ) Cum Rupees Seven Thousand Onlycum 60.00 ₹7,000 — — not billed / not read high [1]
ubble Course Rubble Masonry (Firt Sort) MORTH specifications No.1405.4) Cum Y Hundred Onlycum 102.61 ₹3,600 — — not billed / not read high [1]
ble Course Rubble Masonry (Firt Sort) MORTH specifications No.1405.4 By fs Hundred Only eenos 99.90 ₹2,500 — — not billed / not read high [1]
tled material, disposal of unserviceable material and stacking Cum Rupees Two Hundred onlycum 182.26 ₹200 — — not billed / not read high [1]
rting the dismantled material, disposal of unserviceable material and stacking Cum onal iycum 45.00 ₹750 — — not billed / not read high [1]

Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.

Timeline

  1. 03 May 2019 Running bill ₹1.47 Cr paid source
  2. 13 Sep 2019 Running bill ₹1.43 Cr paid source
  3. 10 Jan 2020 Third and Final bill ₹16.22 L paid source
  4. 04 Aug 2021 First and Final bill ₹4.95 L paid source

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
Running 000008 · 11 Apr 2019 — ₹1,47,31,000₹1,40,11,046 RTGS 000033 03 May 2019 M/s R K Brothers Infraprop Proventures Private Limited BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None
Running 000075 · 19 Aug 2019 — ₹1,42,96,000₹1,35,82,214 RTGS 000185 13 Sep 2019 M/s R K Brothers Infraprop Proventures Private Limited BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None
Third and Final 000143 · 02 Jan 2020 — ₹16,22,000₹15,39,534 RTGS 000343 10 Jan 2020 M/s R K Brothers Infraprop Proventures Private Limited BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None
First and Final 000116 · 28 Dec 2020 — ₹4,95,000₹4,45,500 RTGS 000137 04 Aug 2021 M/s Preethi Cad Consulting Engineers Pvt Ltd BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…desilting of all storm water drains in Koramangala Zone…"