Drains & storm-water · job 307-15-000093
Construction of elemental bridge across 80 feet road Koramangala for SWD K-113(near passport office)
₹4.22 Crcontract / award · inferred
₹1.55 Crpaid, gross
4bills
06 May 2016last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
no tender found for these bills
Signals — patterns worth a closer look, not findings of wrongdoing
- info Fine / penalty deducted from a bill confirmed
1 · What was planned
Work
Construction of elemental bridge across 80 feet road Koramangala for SWD K-113(near passport office)
confirmed [1]
Where
80 Feet Road
inferred
Place names read from the work description text
Estimated cost
Unknown
unknown
No estimate published for this work in the sources used
Tender published
Unknown
unknown
No tender found or matched for this work
Time allowed
Unknown
unknown
No tender document found or matched
2 · Who got the work (contract)
Contractor
Contractor identity
C0055 · Manu.L
confirmed [1]
Resolved contractor C0055 “Manu.L”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
₹4.22 Cr
inferred [1]
Contract / tender price stated in the Work Order (read by OCR from the scanned document)
3 · Work documented
Bills recorded
Work documents
Quantities: planned vs billed
1 planned items read (Estimate); no billed / measured quantity could be read
inferred [1] [2] +2
Planned quantities (Schedule B / estimate) against billed (bill abstracts) and measured (typed MB sheets) quantities. Only rows where quantity × rate = amount on the scanned page are used; handwritten MB pages are left unread. Never overrides IFMS amounts.
↳ from a tender matched to these bills (none confidence) — why
4 · Money paid
Paid (gross)
Paid (nett)
Paid vs contract
Bills
First payment
Last payment
Fines / withheld / recoveries
Bill → payment (median days)
Approval remarks
33 remark(s); e.g. 2015-11-27: “Approved by CAO — Bill approved for payment and scrutiny forwarded by EE .”
confirmed [1]
Remarks written by officials in the IFMS approval chain
27 Aug 2015cumulative payments06 May 2016
5 · Completion
Status
Completed (final bill)
inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown
unknown
Actual start date is not published
Expected completion
Unknown
unknown
Stipulated period of completion not found in any public record
Final bill
Completed on
Unknown
unknown
Final bill does not carry an end date
Completion certificate date
25 Feb 2016
inferred [1]
Completion date stated in the Completion Certificate (read by OCR from the scanned document)
Extensions of time
1 extension-of-time order(s): to 2016-03-30, fine ₹5,000
inferred [1]
Extension-of-time orders attached to this job's bills in IFMS, read by OCR. A later order supersedes an earlier one; an order may belong to an earlier contract under the same job.
↳ from a tender matched to these bills (none confidence) — why
6 · Physical evidence
Quantities: Schedule B vs billed — read from scanned documents; only rows where quantity × rate = amount are used
| Item | Unit | Planned | Rate | Billed / measured | Difference | Basis | Confidence | Source |
|---|---|---|---|---|---|---|---|---|
| shy soil - A. Manual Means Upto m depth MORTH. Specification No. lL For Desilting of drain | — | 600.00 | ₹9 | — | — | not billed / not read | medium | [1] |
Running-bill figures show progress at that bill, not final quantities. Comparisons are inferred; see methodology.
Timeline
How the tender and the bills were connected
Tenders and BBMP bills share no common number, so connections are inferred from independent evidence. Accepted links feed the facts above (marked inferred); possible ones are listed only for review and change nothing.
Possible — not merged ·
BBMP/2014-15/OW/WORK_INDENT12991 (BBMP tender list 2013–18) ·
confidence possible · description similarity 45%
“Maintainence of Koramangala, 7th Block, 80 feet Road and Rose Garden Park ward no 151” source
✓ same kind of work (road) · same place(s): 80 feet road · bills start 140 days after tender
✗ ward numbers differ (tender 151, 174, 186) · paid is 9345% of tender value
Bills & payments (BBMP)
| Bill type | Bill reg. (BR) | Work order | Gross | Nett | Payment | Payee | Source |
|---|---|---|---|---|---|---|---|
| Running | 000030 · 21 May 2015 | — | ₹41,23,050 | ₹38,64,600 | RTGS 000693 27 Aug 2015 | Manu.L | BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None |
| Running | 000133 · 31 Aug 2015 | — | ₹50,72,700 | ₹47,53,550 | RTGS 001327 14 Dec 2015 | Manu.L | BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None |
| Running | 000228 · 28 Dec 2015 | — | ₹17,79,600 | ₹16,66,000 | RTGS 002756 16 Feb 2016 | Manu.L | BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None |
| Fourth and Final | 000324 · 31 Mar 2016 | — | ₹45,35,050 | ₹42,29,350 | RTGS 000019 06 May 2016 | Manu.L | BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None |
Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.
Why this is a Koramangala project
Work description names Koramangala: "…of elemental bridge across 80 feet road Koramangala for SWD K-113(near passport o…"