Roads, drains & footpaths (combined)
Construction of ESI Hospitals, BBMP Office Building at Koramangala 5th Block, Ambedkar Samudhaya Bhavana and Additional Improvements to Samudhaya Bhavana and Improvements to Roads, drains, Footpath and over all developments at ward No. 177, 178, 179, 180 and surrounding works in BTM Layout Constituency (Package No. 03)
₹10.71 Crcontract / award · confirmed
—paid, gross
0bills
22 Apr 2026last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
Tender BSCC/2025-26/OW/WORK_INDENT20
tender record only, no bills found yet
Signals — patterns worth a closer look, not findings of wrongdoing
-
info Contractor holds 2% of Koramangala money (8 projects) inferred
C0017 AWIKA CONSTRUCTIONS (identity inferred; ids: KPPP:17612): ₹138,251,234 across 8 projects in this dataset. Concentration is common for ward maintenance contracts; it is context, not a finding.
Related: 151-20-000102, 148-20-000026, 151-20-000081, 151-20-000079, 151-18-000023, 151-17-000035 …
1 · What was planned
Work
Construction of ESI Hospitals, BBMP Office Building at Koramangala 5th Block, Ambedkar Samudhaya Bhavana and Additional Improvements to Samudhaya Bhavana and Improvements to Roads, drains, Footpath and over all developments at ward No. 177, 178, 179, 180 and surrounding works in BTM Layout Constituency (Package No. 03)
confirmed [1]
Where
Koramangala 5th Block
inferred
Place names read from the work description text
Estimated cost
Budget provision
Tender published
Tender calls
Time allowed
360 days (~12 months)
confirmed [1]
Stipulated period of completion in the tender document (“12 months”, kw-4 Item 03 pkg -03.doc)
2 · Who got the work (contract)
Contractor
Contractor identity
C0017 · AWIKA CONSTRUCTIONS
inferred [1]
Resolved contractor C0017 “AWIKA CONSTRUCTIONS”; identifiers: KPPP:17612; name variants joined by: same / truncated name ×1, KPPP name matches IFMS payee name ×2. Also appears as: HITESH KUMAR S( Awika Constructions ), Hitesh kumar S, Sri. Hitesh Kumar S.
Contract value
Bidders
2
confirmed [1]
Bidders in the commercial comparative statement: L1 HITESH KUMAR S( Awika Constructions ) ₹112,220,480; L2 G V GOPAL REDDY( GVR INFRASTRUCTURES ) ₹114,280,249
Awarded on
2 bids on BSCC/2025-26/OW/WORK_INDENT20
| L1 | HITESH KUMAR S( Awika Constructions ) | ₹11,22,20,480 |
| L2 | G V GOPAL REDDY( GVR INFRASTRUCTURES ) | ₹11,42,80,249 |
3 · Work documented
4 · Money paid
Paid (gross)
Unknown
unknown
No bill or payment for this work found in published BBMP data
5 · Completion
Status
Work started
Unknown
unknown
Actual start date is not published
Expected completion
Completed on
Unknown
unknown
No bills yet
6 · Physical evidence
Satellite imagery
Inconclusive
inferred [1] [2]
Manual comparison of satellite captures 2026-01-08 (WV02, 0.5 m) → None around the geocoded point: No archived capture post-dates the April 2026 award; the latest is 2026-01-08. A later Esri release is needed. Experimental: location is geocoded from place names in the description, captures are not perfectly co-registered, and small works (drains, footpaths) are below what 0.3–0.6 m imagery can show.
Timeline
Tender notices
| Tender no. | Source | Published | Status | Estimate | Awarded | To | Time allowed | Link | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| BSCC/2025-26/OW/WORK_INDENT20 | KPPP | 01 Dec 2025 | Awarded | ₹10.30 Cr | ₹10.71 Cr | HITESH KUMAR S( Awika Constructions ) | 360 days | exact | record · award · tender doc |
Why this is a Koramangala project
Tender title names Koramangala: "…ESI Hospitals, BBMP Office Building at Koramangala 5th Block, Ambedkar Samudhaya…"