Additional contsruction of Govt.School,Rajendranagar, 8th block Koramangala in Adugodi ward No.147

Completed (final bill) Bruhat Bengaluru Mahanagara Palike · Executive Engineer B T M Layout South Zone
—contract / award · unknown
₹19.01 Lpaid, gross
1bills
12 Oct 2018last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
Tender BBMP/2017-18/OW/WORK_INDENT27422 tender ↔ bills linked by matching (medium confidence)

Signals — patterns worth a closer look, not findings of wrongdoing

1 · What was planned

Work
Additional contsruction of Govt.School,Rajendranagar, 8th block Koramangala in Adugodi ward No.147 confirmed [1]
Where
Rajendranagar; 8th Block Koramangala; Adugodi inferred
Place names read from the work description text
Ward
147 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
₹19.78 L inferred [1]
Estimated Contract Value (ECV) in the tender
↳ from a tender matched to these bills (medium confidence) — why
Tender published
01 Nov 2017 inferred [1]
Date the first call of the tender was published
↳ from a tender matched to these bills (medium confidence) — why
Tender calls
1 (first call) inferred [1]
Tender awarded/listed on its first call
↳ from a tender matched to these bills (medium confidence) — why
Time allowed
Unknown unknown
Tender document not available or period not stated

2 · Who got the work (contract)

Contractor
K Satish Nayak confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0012 · SATHISH NAYAK K inferred [1]
Resolved contractor C0012 “SATHISH NAYAK K”; identifiers: no official identifier in the data; name variants joined by: same registered mobile on BBMP bills (not published) + similar name ×28, same / truncated name ×2. Also appears as: K Satish Nayak, Sathis Nayak, Sathish Nayak, Satish Nayak, Sri Satish Nayak….
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched
Work order date
06 Feb 2018 confirmed [1]
Work order date on the bill (order no. 000144)

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×1; M.B ×1; Quality Certificate ×1 confirmed [1] [2] +1
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹19.01 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹17.47 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
12 Oct 2018 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
12 Oct 2018 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
250 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
10 remark(s); e.g. 2018-10-15: “Approved by CAO — Approved for payment as per the verification report” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
25 Dec 2017 confirmed [1]
Work start date on the bill
Expected completion
Unknown unknown
Stipulated period of completion not found in any public record
Final bill
Raised 08 Feb 2018 confirmed [1]
A bill of type “First and Final” exists
Completed on
25 Jan 2018 confirmed [1]
Work end date recorded on the final bill

6 · Physical evidence

Site photos
1 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1]
Photos attached to the bills in IFMS (type as labelled by the uploader)
Satellite imagery
Location could not be pinned down inferred [1] [2]
Manual comparison of satellite captures 2017-12-10 (WV03_VNIR, 0.31 m) → 2020-02-28 (WV03_VNIR, 0.31 m) around the geocoded point: The Rajendranagar school is not in OSM; the fallback is the 8th Block area. No individual building can be attributed. Experimental: location is geocoded from place names in the description, captures are not perfectly co-registered, and small works (drains, footpaths) are below what 0.3–0.6 m imagery can show.

Timeline

  1. 01 Nov 2017 Tender BBMP/2017-18/OW/WORK_INDENT27422 published — estimate ₹19.78 L inferred source
  2. 25 Jan 2018 Work end date on final bill
  3. 06 Feb 2018 Work order issued source
  4. 12 Oct 2018 First and Final bill ₹19.01 L paid source

Tender notices

Tender no.SourcePublishedStatusEstimateAwardedToTime allowedLinkEvidence
BBMP/2017-18/OW/WORK_INDENT27422BBMP list01 Nov 2017Tender published (outcome not in this list) ₹19.78 L—— —medium record · row 3389

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000136 · 08 Feb 2018 000144 06 Feb 2018 ₹19,01,288₹17,47,296 006642 12 Oct 2018 K Satish Nayak BBMP Work Orders - Adugodi (Ward 147), 2013-2022 · row 111

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…of Govt.School,Rajendranagar, 8th block Koramangala in Adugodi ward No.147…"