Buildings & civic facilities
CONSTRUCTION OF 72 PC QUARTERS FOR 3RD BATTALION (48 PC) & 4TH BATTALION (24 PC) KSRP AT KORAMANGALA, BANGALORE IN BANGALORE URBAN DISTRICT UNDER POLICE GRUHA 2025 (PHASE-4) SCHEME PACKAGE No.32 ON LUMP SUM TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE)
₹18.96 Crcontract / award · confirmed
—paid, gross
0bills
03 Jul 2025last activity
- Planned
- Contracted
- Work documented
- Paid
- Completed
- Physical evidence
Tender KSPHIDCL/2023-24/BD/WORK_INDENT69
tender record only, no bills found yet
1 · What was planned
Work
CONSTRUCTION OF 72 PC QUARTERS FOR 3RD BATTALION (48 PC) & 4TH BATTALION (24 PC) KSRP AT KORAMANGALA, BANGALORE IN BANGALORE URBAN DISTRICT UNDER POLICE GRUHA 2025 (PHASE-4) SCHEME PACKAGE No.32 ON LUMP SUM TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE)
confirmed [1]
Where
Unknown
unknown
No place name could be read from the description
Estimated cost
Budget provision
Tender published
Tender calls
Time allowed
330 days (~11 months)
confirmed [1]
Stipulated period of completion in the tender document (“11 Months”, PKG-32 PG 2025 Ph-4 works _G+2_.pdf)
2 · Who got the work (contract)
Contractor
Contractor identity
C0324 · Singe gowda rathna ravi
confirmed [1]
Resolved contractor C0324 “Singe gowda rathna ravi”; identifiers: KPPP:932; name variants joined by: single name variant.
Contract value
Awarded on
3 · Work documented
4 · Money paid
Paid (gross)
Unknown
unknown
No bill or payment for this work found in published BBMP data
5 · Completion
Status
Work started
Unknown
unknown
Actual start date is not published
Expected completion
Completed on
Unknown
unknown
No bills yet
6 · Physical evidence
Satellite imagery
Inconclusive
inferred [1] [2]
Manual comparison of satellite captures 2025-02-13 (WV02, 0.5 m) → None around the geocoded point: Between 2025-02-13 and 2026-01-08 some low structures inside the campus south of the road appear cleared, which would fit site preparation. The OSM point is a generic 'KSRP' node and the two captures are not co-registered, so the change cannot be tied to the 72-quarter project. Experimental: location is geocoded from place names in the description, captures are not perfectly co-registered, and small works (drains, footpaths) are below what 0.3–0.6 m imagery can show.
Timeline
Tender notices
| Tender no. | Source | Published | Status | Estimate | Awarded | To | Time allowed | Link | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| KSPHIDCL/2023-24/BD/WORK_INDENT69 | KPPP | 08 Feb 2024 | Awarded | ₹18.99 Cr | ₹18.96 Cr | Singe gowda rathna ravi | 330 days | exact | record · award · tender doc |
Why this is a Koramangala project
Tender title names Koramangala: "…(48 PC) & 4TH BATTALION (24 PC) KSRP AT KORAMANGALA, BANGALORE IN BANGALORE URBAN…"