Bengaluru Public Works Explorer Koramangala

← All works

Drains & storm-water · job 151-18-000043

Improvements and Desilting of secondary drains at Koramangala ward no 151

Completed (final bill) Bruhat Bengaluru Mahanagara Palike
—contract / award · unknown
₹9.39 Lpaid, gross
1bills
22 Jul 2019last activity
  1. Planned
  2. Contracted
  3. Work documented
  4. Paid
  5. Completed
  6. Physical evidence
Tender EE(BTM)/JE/e-proc/02/2018-19 tender ↔ bills linked by matching (medium confidence)

1 · What was planned

Work
Improvements and Desilting of secondary drains at Koramangala ward no 151 confirmed [1]
Where
Unknown unknown
No place name could be read from the description
Ward
151 (198-ward map) confirmed [1]
Ward the bills are booked to
Estimated cost
Unknown unknown
No estimate published for this work in the sources used
Tender published
12 Sep 2018 inferred [1]
Date the first call of the tender was published
↳ from a tender matched to these bills (medium confidence) — why
Tender calls
1 (first call) inferred [1]
Tender awarded/listed on its first call
↳ from a tender matched to these bills (medium confidence) — why
Time allowed
60 days (~2 months) inferred [1]
Period of completion in the tender notification (“60 Days”) (read by OCR from a scanned government document — digits may be misread)
↳ from a tender matched to these bills (medium confidence) — why

2 · Who got the work (contract)

Contractor
Smt C Pushpa (M P Constructiohn) confirmed [1]
Payee with the largest billed amount under this job number
Contractor identity
C0245 · Smt C Pushpa (M P Constructiohn) confirmed [1]
Resolved contractor C0245 “Smt C Pushpa (M P Constructiohn)”; identifiers: no official identifier in the data; name variants joined by: single name variant.
Contract value
Unknown unknown
Contract (work-order) value is not published in BBMP bill data and no awarded tender was matched

3 · Work documented

Bills recorded
0 running, 1 final paid/registered confirmed [1]
Bill types recorded in BBMP IFMS for this job's work bills
Work documents
Completion Certificate ×2; M.B ×2; Quality Certificate ×1 confirmed [1] [2] +1
Documents attached to the bills in IFMS (their presence is recorded; contents are not verified)

4 · Money paid

Paid (gross)
₹9.39 L confirmed [1]
Sum of 1 bill(s) under the job number
Paid (nett)
₹8.93 L confirmed [1]
Gross minus statutory deductions (tax, security deposit, etc.)
Bills
1 confirmed [1]
Unique bills after merging duplicates across exports
First payment
22 Jul 2019 confirmed [1]
Earliest payment (CBR/RTGS) date
Last payment
22 Jul 2019 confirmed [1]
Latest payment (CBR/RTGS) date
Bill → payment (median days)
51 confirmed [1]
Median days from bill registration to RTGS payment over 1 IFMS bill(s)
Approval remarks
12 remark(s); e.g. 2019-07-19: “Approved by CAO — ಟಿ.ವಿ.ಸಿ.ಸಿರವರ ಅನುಮೋದನೆ ಮೇರೆಗೆ ಸದರಿ ಬಿಲ್ಲನ್ನು ಅನುಮೋದಿಸಿದೆ.” confirmed [1]
Remarks written by officials in the IFMS approval chain

5 · Completion

Status
Completed (final bill) inferred [1]
Inferred from the final bill: BBMP raises the final bill when measurement of the completed work is recorded
Work started
Unknown unknown
Actual start date is not published
Expected completion
Unknown unknown
Stipulated period is 60 days but no award/work-order date to count from
Final bill
Raised 01 Jun 2019 confirmed [1]
A bill of type “First and Final” exists
Completed on
Unknown unknown
Final bill does not carry an end date

6 · Physical evidence

Site photos
3 site photo(s) attached (before / during / after as labelled); no GPS on any photo checked confirmed [1] [2] +1
Photos attached to the bills in IFMS (type as labelled by the uploader)

Timeline

  1. 12 Sep 2018 Tender EE(BTM)/JE/e-proc/02/2018-19 published inferred source
  2. 22 Jul 2019 First and Final bill ₹9.39 L paid source

Tender notices

Tender no.SourcePublishedStatusEstimateAwardedToTime allowedLinkEvidence
EE(BTM)/JE/e-proc/02/2018-19BBMP list12 Sep 2018Tender notified (outcome not in this document) ——— 60 daysmedium record

Bills & payments (BBMP)

Bill typeBill reg. (BR)Work orderGrossNettPaymentPayeeSource
First and Final 000055 · 01 Jun 2019 — ₹9,38,528₹8,93,062 RTGS 000119 22 Jul 2019 Smt C Pushpa (M P Constructiohn) BBMP IFMS payment grid (all paid work bills, mid-2015 onward) · row None

Original system: BBMP Works Bill Public View / IFMS (account.bbmpgov.in). Linked files are public exports of that data on OpenCity.

Why this is a Koramangala project

Work description names Koramangala: "…ts and Desilting of secondary drains at Koramangala ward no 151…"