Case file · KP6-151-20-000096

set aside

Executed quantities identical to Schedule B

KP6-151-20-000096 · confidence low · priority score 31.4/100 (ranking aid, not a judgement)

This project was reviewed and set aside: every issue was explained, was an artefact, or rests only on low-confidence evidence

Project

Comprehensive development and Improvements to roads in 7th Block. Shanthinagara society Ejipura ward. Venkateshwara temple. 8th A.B.C Roads. 5th Block. 8th block Koramangala village 3rd J Block. 5th block Industrial layout. MIG Houses judges park roads and surrounding roads in Ward No. 147. 148. 151 and 173 Koramangala sub divison Annexure-5

Job 151-20-000096 · Roads · 7th Block; Ejipura; 5th Block; 8th Block Koramangala · Bruhat Bengaluru Mahanagara Palike

Contractor: RAMACHANDRA RAJU K · paid to, per IFMS bills: INFRA TECHNOCRATS CO ₹4.90 L (2021-08-13 → 2021-08-13); RAMACHANDRA RAJU K ₹9.96 Cr (2022-01-29 → 2022-04-11); H & P CONSULTANTS ₹4.96 L (2022-05-26 → 2022-05-26)

Project page with every fact and source →

What was promised

Contract / work-order value
not read (unknown)
Estimate
—
Work order
EE/BTM/WO/ lele6 /2020-21 dated 2020-12-30
Stipulated completion
—

What happened

Paid (gross / net)
₹10.06 Cr / ₹9.50 Cr
Bills
5 · 14 Sep 2021 → 23 Jan 2023
Final bill
26 May 2022
Status
Completed (final bill)

Why this case deserves follow-up

Examined and set aside on this project:

  • quantities identical to plan (low confidence): only 0 of the 3 identical items are confirmed by a final bill or comparative statement; the rest are running-bill snapshots, which Phase 6 showed can change by the final bill.

Possible legitimate explanations

  • Quantities fixed by drawings (e.g. counted items, standard sections) are executed exactly as designed.
  • The item was measured once and the measurement equalled the estimate.
  • The estimate itself was prepared from detailed measurements of the site.

What would resolve it

  • MB pages with the actual dimensions for these items
  • Site measurement of the items

Questions an investigator could ask

  1. Which MB pages record the measurements of the 3 items on job 151-20-000096 whose executed quantity equals the tendered quantity exactly?
  2. Who recorded and who check-measured these items, and on what dates?
  3. Were these items measured on site or carried over from the estimate?

Specific records to request (RTI)

  1. Measurement-book pages for the items listed — job 151-20-000096; 826.46 cum @ ₹1,000.00; 1,987.52 cum @ ₹1,600.00; 1,465.16 @ ₹25.00. Why: Shows whether the quantities were measured on site or copied from the estimate.

Evidence

    IFMS work bills for this job: 447785, 495927, 503468, 511618, 520975